Decision 14/2023/QD-TTg List of energy-consuming devices and equipment subject to elimination

  • Summary
  • Content
  • Status
  • Vietnamese
  • Download
Save

Please log in to use this function

Send link to email

Please log in to use this function

Error message
Font size:

ATTRIBUTE

Decision No. 14/2023/QD-TTg dated May 24, 2023 of the Prime Minister providing for the lists of, and roadmaps for eliminating, energy-consuming devices and equipment subject to elimination, and low-efficient power generation units banned from construction
Issuing body: Prime MinisterEffective date:
Known

Please log in to a subscriber account to use this function.

Don’t have an account? Register here

Official number:14/2023/QD-TTgSigner:Tran Hong Ha
Type:DecisionExpiry date:Updating
Issuing date:24/05/2023Effect status:
Known

Please log in to a subscriber account to use this function.

Don’t have an account? Register here

Fields:Electricity

SUMMARY

From July 15, low-efficiency rice cookers are not allowed to manufactured

On May 24, 2023, the Prime Minister issues Decision No. 14/2023/QD-TTg providing for the lists of, and roadmaps for eliminating, energy-consuming devices and equipment subject to elimination, and low-efficient power generation units banned from construction.

1. 3 groups of low-efficiency energy-consuming devices and equipment subject to elimination include:

- Household appliances: Compact fluorescent lamps, electronic ballasts for fluorescent lamps, electromagnetic ballasts for fluorescent lamps, linear tubular fluorescent lamps, storage water heaters, infrared hobs, induction hubs, LED lamps, non-ducted air conditioners, clothes washing machines for household use, television sets, rice cookers, electric fans, refrigerator, refrigerator-freezer, and freezer.

- Office and commercial equipment: Computer monitors, copiers, printers, notebook computers, desktop computers, and commercial refrigerated cabinets.

- Industrial equipment: Three-phase asynchronous squirrel cage electrical motors, distribution transformers, LED road and street lighting luminaires, and industrial boilers.

2. Low-efficiency coal-fired and gas-fired generating sets in thermal power plants are banned from construction, in which:

- The policies for investment in coal-fired or gas-fired generating sets whose efficiency fails to satisfy the minimum energy efficiency standards are disapproved.

- Coal-fired and gas-fired generating sets with efficiency at the time of starting commercial operation lower than the specified efficiency corresponding to each power range of the unit are banned from operation.

This Decision takes effect on July 15, 2023.

For more details, click here.
Download files here.
LuatVietnam.vn is the SOLE distributor of English translations of Official Gazette published by the Vietnam News Agency
Effect status: Known

THE PRIME MINISTER

 

THE SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedom - Happiness

No. 14/2023/QD-TTg

 

Hanoi, May 24, 2023

DECISION

Providing for the lists of, and roadmaps for eliminating, energy-consuming devices and equipment subject to elimination, and low-efficient power generation units banned from construction[1]

 

Pursuant to the June 19, 2015 Law on Organization of the Government; and the November 22, 2019 Law Amending and Supplementing a Number of Articles of the Law on Organization of the Government and the Law on Organization of Local Administration;

Pursuant to the June 28, 2010 Law on Economical and Efficient Use of Energy;

Pursuant to the Government’s Decree No. 21/2011/ND-CP of March 29, 2011, detailing, and providing for measures to implement, the Law on Economical and Efficient Use of Energy;

At the proposal of the Minister of Science and Technology;

The Prime Minister promulgates the Decision providing for the lists of, and roadmaps for eliminating, energy-consuming devices and equipment subject to elimination, and low-efficient power generation units banned from construction.

Article 1. Scope of regulation

1. This Decision provides for the lists of, and roadmaps for eliminating, low-efficient energy-consuming devices and equipment subject to elimination (banned from import and production and trading in the country) and low-efficient power generation units banned from construction.

2. This Decision does not apply to devices and equipment that are temporarily imported for re-export or used in service of repair, replacement, or inspection of energy efficiency levels.

Article 2. Subjects of application

This Decision applies to state agencies, enterprises, organizations and individuals engaged in the import, production and trading of the goods specified in Article 3 of this Decision.

Article 3. The lists of, and roadmaps for eliminating, low-efficient energy-consuming devices and equipment subject to elimination and low-efficient power generation units banned from construction

1. The list of, and roadmap for eliminating, low-efficient energy-consuming devices and equipment subject to elimination are provided in Appendix I to this Decision, covering:

a/ Group of household appliances: compact fluorescent lamps, electronic ballasts for fluorescent lamps, electromagnetic ballasts for fluorescent lamps, linear tubular fluorescent lamps, storage water heaters, infrared hobs, induction hobs, LED lamps, non-ducted air conditioners, clothe washing machines for household use, television sets, rice cookers, electric fans, refrigerators, refrigerator-freezers, and freezers.

b/ Group of office and commercial equipment: computer monitors, copiers, printers, notebook computers, desktop computers, and commercial refrigerated cabinets.

c/ Group of industrial equipment: three-phase asynchronous squirrel cage electrical motors, distribution transformers, LED road and street lighting luminaires, and industrial boilers.

2. The list of, and roadmap for eliminating, low-efficient coal or gas-powered generation units in thermal power plants banned from construction are provided in Appendix II to this Decision:

a/ Not to approve investment policy for coal- or gas-powered thermal power plants whose efficiency is lower than the efficiency corresponding to the capacity range of the power generation units provided in Appendix II to this Decision.

b/ Not to license the operation of coal- or gas-powered generation units whose efficiency at the time of commercial operation is lower than the efficiency corresponding to capacity range of the power generation units provided in Appendix II to this Decision.

Article 4. Organization of implementation

1. The Ministry of Science and Technology shall:

a/ Assume the prime responsibility for, and coordinate with ministries, ministerial-level agencies, government-attached agencies and provincial-level People’s Committees in, taking solutions to support the elimination of energy-consuming devices and equipment subject to elimination and low-efficient power generation units banned from construction specified in this Decision.

b/ Assume the prime responsibility for, and coordinate with related ministries and sectors in, formulating national standards on energy efficiency and minimum energy efficiency levels of energy-consuming devices and equipment.

c/ Based on the socio-economic development and state management requirements, assume the prime responsibility for, and coordinate with line ministries and sectors in, reviewing, and proposing the Prime Minister to decide to modify, supplement or replace, the lists of energy-consuming devices and equipment subject to elimination and power generation units banned from construction.

2. The Ministry of Industry and Trade shall:

a/ Assume the prime responsibility for, and coordinate with the Ministry of Science and Technology in, examining and inspecting the compliance with regulations on elimination of low-efficient energy-consuming equipment and low-efficient power generation units banned from construction as specified in this Decision.

b/ Assume the prime responsibility for, and coordinate with related ministries and sectors in, guiding and checking the import and export of goods in compliance with regulations on elimination of energy-consuming equipment subject to elimination and low-efficient power generation units banned from construction as specified in this Decision.

c/ Coordinate with the Ministry of Science and Technology in formulating and reviewing national standards on energy efficiency and minimum energy efficiency levels of energy-consuming devices and equipment.

3. Ministries, sectors and localities shall, based on their functions, tasks and management competence, assume the prime responsibility for eliminating energy-consuming devices and equipment and low-efficient power generation units banned from construction.

Article 5. Implementation provisions

1. This Decision takes effect on July 15, 2023.

The Prime Minister’s Decision No. 24/2018/QD-TTg of May 18, 2018, promulgating the lists of, and roadmaps for eliminating, energy-consuming devices and equipment subject to elimination and low-efficient power generation units banned from construction, ceases to be effective on the effective date of this Decision.

2. Ministers, heads of ministerial-level agencies, heads of government-attached agencies, chairpersons of provincial-level People’s Committees, heads of agencies, units, and concerned organizations and individuals shall implement this Decision.-

For the Prime Minister
Deputy Prime Minister
TRAN HONG HA

Appendix I

LIST OF, AND ROADMAP FOR ELIMINATING, LOW-EFFICIENT ENERGY-CONSUMING EQUIPMENT BANNED FRON IMPORT, PRODUCTION AND TRADING

(To the Prime Minister’s Decision No. 14/2023/QD-TTg of May 24, 2023)

It is not permitted to import, produce and trade in equipment whose energy efficiency does not satisfy the minimum energy efficiency levels specified in national standards, specifically as follows:

No.

Name of equipment

National standards

Roadmap for elimination

I. Group of household appliances:

 

1

Compact fluorescent lamps

TCVN 7896:2015

From the effective date of this Decision

2

Electronic ballasts for fluorescent lamps

TCVN 7897:2013

3

Electromagnetic ballasts for fluorescent lamps

TCVN 8248:2013

4

Linear tubular fluorescent lamps

TCVN 8249:2013

5

Electric fans

TCVN 7826:2015

6

Clothe washing machines for household use

TCVN 8526:2013

7

Rice cookers

TCVN 8252:2015

8

LED lamps

TCVN 11844:2017

From April 1, 2025

9

Infrared hobs

TCVN 13373:2021

10

Induction hobs

TCVN 13372:2021

11

Refrigerators

TCVN 7828:2016

12

Refrigerator-freezers

TCVN 7828:2013

From the effective date of this Decision through March 31, 2025

TCVN 7828:2016

From April 1, 2025

13

Storage water heaters

TCVN 7898:2009

From the effective date of this Decision through March 31, 2025

TCVN 7898:2018

From April 1, 2025

14

Non-ducted air conditioners

TCVN 7830:2015

From the effective date of this Decision through March 31, 2025

TCVN 7830:2021

From April 1, 2025

15

Television sets

TCVN 9536:2012

From the effective date of this Decision through March 31, 2025

 

TCVN 9536:2021

From April 1, 2025

II. Group of office and commercial equipment:

 

1

Copiers

TCVN 9510:2012

From the effective date of this Decision

 

2

Printers

TCVN 9509:2012

3

Computer monitors

TCVN 9508:2012

4

Commercial refrigerated cabinets

TCVN 10289:2014

5

Notebook computers

TCVN 11848:2021

From April 1, 2025

6

Desktop computers

TCVN 13371:2021

III. Group of industrial equipment:

 

1

Three-phase asynchronous squirrel cage electrical motors

TCVN 7540-1:2013

From the effective date of this Decision

 

2

Distribution transformers

TCVN 8525:2015

3

LED road and street lighting luminaires

TCVN 12666:2019

From April 1, 2025

4

Industrial boilers

TCVN 8630:2010

From the effective date of this Decision through March 31, 2025

 

TCVN 8630:2019

From April 1, 2025

 

Appendix II

LIST OF, AND ROADMAP FOR ELIMINATING, LOW-EFFICIENT COAL- OR GAS-POWERED GENERATION UNITS IN THERMAL POWER PLANTS BANNED FROM CONSTRUCTION

(To the Prime Minister’s Decision No. 14/2023/QD-TTg of May 24, 2023)

It is not permitted to build new coal- or gas-powered generation units whose efficiency is lower than the prescribed one, specifically as follows:

No.

General units

Efficiency (%)

Roadmap for elimination

I. For coal-powered generation units, the low heating value efficiency at the rated capacity, in the condition of input cooling water temperature of 28°C and ambient temperature of 30°C, must not be lower than:

 

1

Units with capacity of between 50 MW and below 150 MW

34

From the effective date of this Decision

2

Units with capacity of between 150 MW and below 300 MW

38

3

Units with capacity of between 300 MW and below 600 MW

39

4

Units with capacity of between 600 MW and below 800 MW

41

5

Units with capacity of 800 MW or more

43

II. For gas-powered generation units using single-cycle gas turbine technology, the efficiency of the gas turbines (in the ambient air environment of 15°C and 760 mmHg and humidity of 60%) must not be lower than:

 

1

Units with capacity of between 100 MW and below 150 MW

33

From the effective date of this Decision

2

Units with capacity of between 150 MW and below 200 MW

34

3

Units with capacity of between 200 MW and below 300 MW

37

4

Units with capacity of 300 MW or more

39

III. For gas-powered generation units using combined cycle gas turbine technology, the efficiency of the combined cycle gas turbine assembly (ambient air state: 15°C, 760 mmHg and humidity: 60%) calculated based on a single gas turbine unit, must not be lower than:

 

1

Units with capacity of between 100 MW and below 150 MW

49.5

From the effective date of this Decision

2

Units with capacity of between 150 MW and below 200 MW

51

3

Units with capacity of between 200 MW and below 300 MW

55.5

4

Units with capacity of 300 MW or more

58.5

 


[1] Công Báo Nos 727-728 (06/6/2023)

Please log in to a subscriber account to see the full text. Don’t have an account? Register here
Please log in to a subscriber account to see the full text. Don’t have an account? Register here
Processing, please wait...
LuatVietnam.vn is the SOLE distributor of English translations of Official Gazette published by the Vietnam News Agency

ENGLISH DOCUMENTS

Official Gazette
Decision 14/2023/QĐ-TTg DOC (Word)

This utility is available to subscribers only. Please log in to a subscriber account to download. Don’t have an account? Register here

Decision 14/2023/QĐ-TTg PDF

This utility is available to subscribers only. Please log in to a subscriber account to download. Don’t have an account? Register here

LuatVietnam's translation
Decision 14/2023/QĐ-TTg DOC (Word)

This utility is available to subscribers only. Please log in to a subscriber account to download. Don’t have an account? Register here

Decision 14/2023/QĐ-TTg PDF

This utility is available to subscribers only. Please log in to a subscriber account to download. Don’t have an account? Register here

* Note: To view documents downloaded from LuatVietnam.vn, please install DOC, DOCX and PDF file readers
For further support, please call 19006192

SAME CATEGORY

Circular No. 13/2023/TT-BTC dated February 28, 2023 of the Ministry of Finance guiding the implementation of the Government’s Decree No. 49/2022/ND-CP of July 29, 2022, amending and supplementing a number of articles of the Government’s Decree No. 209/2013/ND-CP of December 18, 2013, detailing and guiding the implementation of a number of articles of the Law on Value-Added Tax which had a number of articles amended and supplemented under Decree No. 12/2015/ND-CP, Decree No. 100/2016/ND-CP and Decree No. 146/2017/ND-CP, and amending and supplementing the Ministry of Finance’s Circular No. 80/2021/TT-BTC of September 29, 2021

Circular No. 13/2023/TT-BTC dated February 28, 2023 of the Ministry of Finance guiding the implementation of the Government’s Decree No. 49/2022/ND-CP of July 29, 2022, amending and supplementing a number of articles of the Government’s Decree No. 209/2013/ND-CP of December 18, 2013, detailing and guiding the implementation of a number of articles of the Law on Value-Added Tax which had a number of articles amended and supplemented under Decree No. 12/2015/ND-CP, Decree No. 100/2016/ND-CP and Decree No. 146/2017/ND-CP, and amending and supplementing the Ministry of Finance’s Circular No. 80/2021/TT-BTC of September 29, 2021

Electricity , Land - Housing , Tax - Fee - Charge

loading