No. | Name of project | Objectives of project | Location of implementation | Scope/technical specifications | Total investment amount (million USD) | Investment form | Contact address |
I | TRANSPORT INFRASTRUCTURE |
1 | Urban railway line (Metro) No. 4 | To transport passengers through the most densely-populated areas in Ho Chi Minh City through Ben Thanh area along the north-south axis. To provide public passenger transport services with relatively large capacity, safety and less environmental pollution | Districts 1, 3, 4, 7, and 12, and Go Vap, Phu Nhuan and Nha Be districts | Total length of 36.2km starting from Thanh Xuan-Ha Huy Giap-Nguyen Oanh-Nguyen Kiem-Phan Dinh Phung-Hai Ba Trung-Ben Thanh-Nguyen Thai Hoc-Ton Dan-Nguyen Huu Tho-Hiep Phuoc urban center | 4,570 | Official Development Assistance (ODA), Public-Private Partnership (PPP) | Ho Chi Minh City Management Authority of Urban Railways Add: 29 Le Quy Don, Ward 7, District 3, Ho Chi Minh City Tel: 0839309495 Fax: 0839309497 |
2 | Hon Khoai seaport | - To build piers for loading and unloading freights and containers, meeting import and export demands - To build wharves for bulk cargoes, liquefied petroleum gas and towing and patrol ships | Hon Khoai, Ngoc Hien district, Ca Mau province | To be capable of accommodating vessels of up to 250,000 deadweight tonnage (DWT) | 3,500 | Joint venture (JV) or 100% foreign direct investment (FDI) | Ca Mau Investment Promotion and Enterprise Support Center Add: No. 02, Hung Vuong road, Ward 5, Ca Mau city, Ca Mau province |
3 | Trang Bom-Hoa Hung railway section of the Thong Nhat railway route | To improve urban traffic conditions; to reduce traffic congestion, and accidents in urban areas, etc. | Dong Nai, Binh Duong and Ho Chi Minh City | - Total length of 39.07km. - Dual rail, electric traction | 2,977 | PPP | Department of Public-Private Partnership, Ministry of Transport Add: 80 Tran Hung Dao, Hoan Kiem district, Hanoi Tel: 842439410775 |
4 | Bien Hoa-Vung Tau railway | To connect the national railway route to Cai Mep port and other seaports in Ba Ria-Vung Tau | Dong Nai and Ba Ria-Vung Tau | To build 84 km of railway | Phase 1: 1,470 Phase 2: 1,000 | PPP | Department of Public-Private Partnership, Ministry of Transport Add: 80 Tran Hung Dao, Hoan Kiem district, Hanoi Tel: 842439410775 |
5 | Deep-water seaport (Tran De port) | To serve direct import-export of the Mekong River delta region, creating an impetus for investment attraction, socio-economic development in the region | Soc Trang province | - To cover 4,000 ha along the coastline. - 15-20 km to the Tran De estuary, to locate freight and container wharves on around 1,000 ha. - To be capable of accommodating vessels of more than 100,000 DWT. | 2,200 | 100% FDI | Soc Trang province’s Department of Transport Add: No. 20, Tran Hung Dao, Ward 2, Soc Trang city, Soc Trang province |
6 | Urban railway line (Metro) No. 3a | To provide public passenger transport services with relatively large capacity, safety and less environmental pollution. | Districts 1, 3, 5, 6, 10, 11, and Binh Tan and Binh Chanh districts, Ho Chi Minh City | Total length of 19.58 km from the Ben Thanh-Pham Ngu Lao-Cong Hoa intersection-Hung Vuong, Hong Bang-Kinh Duong Vuong-Tan Kien depot and Tan Kien station | 1,820 | ODA, PPP | Ho Chi Minh City Management Authority of Urban Railways Add: 29 Le Quy Don, Ward 7, District 3, Ho Chi Minh City Tel: 0839309495 Fax: 0839309497 |
7 | Mu Gia-Vung Ang railway project | To complete the Vung Ang (Vietnam)-Vientiane (Laos) railway | Ha Tinh and Quang Binh provinces | Total length of around 103 km; technical standard: gauge: 1,435mm; grade-1 railway; design speed: Vmax = 160 km/h; powered by electrification | 1,600 | PPP | Department of Public-Private Partnership, Ministry of Transport Add: 80 Tran Hung Dao, Hoan Kiem district, Hanoi Tel: 842439410775 |
8 | Project on intersection from Ba Di bridge to Pleiku city on National Highway No. 19 | To meet local transport demand and serve socio-economic development in the two localities | Binh Dinh, Gia Lai | To build the expressway | 1,500 | build-operate-transfer (BOT) | Gia Lai province’s Department of Planning and Investment Add: 2 Hoang Hoa Tham, Pleiku, Gia Lai province Tel: 02693824414 |
9 | Urban railway line (Metro) No. 2 (phase 2) | To provide public passenger transport services with relatively large capacity, safety and less environmental pollution | Districts 1, 2 and 12, and Hoc Mon and Cu Chi districts, Ho Chi Minh City | Total length of 9.1 km, including Ben Thanh-Thu Thiem section and Tham Luong-Tay Ninh bus station section | 1,482 | ODA, PPP | Ho Chi Minh City Management Authority of Urban Railways Add: 29 Le Quy Don, Ward 7, District 3, Ho Chi Minh City Tel: 0839309495 Fax: 0839309497 |
10 | Di An-Hoa Lu railway | Linking Vietnam-Laos-Cambodia development triangle (trans-Asia railway); to increase freight transport capacity in regions and along the areas the railway runs through | Ho Chi Minh City, Binh Duong and Binh Phuoc provinces | 128 km long, railway gauge of 1,435mm | 1,400 | PPP | Binh Phuoc province’s Department of Planning and Investment Add: 626 National Highway 14, Tan Phuc district, Dong Xoai city Tel: 02713881788 |
11 | Railway to the Hai Phong international gateway port | To connect the national railway route to Lach Huyen and Dinh Vu and other ports in the region | Hai Phong | To build a new section of 32.66 km of the national railway | 1,400 | PPP | Department of Public-Private Partnership, Ministry of Transport Add: 80 Tran Hung Dao, Hoan Kiem district, Hanoi Tel: 842439410775 |
12 | Construction of Dau Giay-Lien Khuong express-way (Tan Phu-Bao Loc and Bao Loc-Lien Khuong sections) | To develop the transport and tourism systems | Lam Dong and Ninh Thuan provinces | Grade-A expressway of a length of 140km | 1,320 | PPP, BOT | Lam Dong province’s Department of Transport, Add: the Lam Dong Province Administration Center Add: No. 36 Tran Phu, Da Lat city, Lam Dong province. Lam Dong Investment Promotion-Trade and Investment Center Add: No. 02 - 04 Tran Quoc Toan Road, Ward 3, Da Lat city, Lam Dong province. Tel: 02633832964 Fax: 02633811656 |
13 | Buon Me Thuot-Nha Trang express-way | To build a modern, safe and efficient technical infrastructure system; to connect the heart of the Central Highlands region with the southern Central Vietnam; to increase transport capacity, promote tourism development, connect the “forests” and the “sea” | Dak Lak and Khanh Hoa provinces | Total length of 113 km, road grade of 80-120 according to TCVN 5729-2012 with a design speed of 80-120km/h, 6 lanes with road width Bn=32.25 m | 1,236.5 | PPP | Dak Lak province’s Department of Transport Add: No. 7 Dinh Tien Hoang, Buon Ma Thuot city, Dak Lak province |
14 | Ho Chi Minh City-Thu Dau Mot-Chon Thanh express-way | To connect 3 provinces in the southern key economic region, reduce traffic load on National Highway 13, connect the southern key economic region with Cambodia and the Central Highlands region | Ho Chi Minh City, and Binh Duong and Binh Phuoc provinces | Length of 69 km, size of 6-8 lanes | 1,100 | PPP | Binh Phuoc province’s Department of Planning and Investment Add: 626 National Highway 14, Tan Phu ward, Dong Xoai city Tel: 02713881787 |
15 | Chan May port’s tourism wharf and logistics zone in service of tourists | To build the wharf to accommodate cruise ships, meeting the travelling demand through the port and the port’s logistics zone to serve tourists | Loc Vinh commune, Phu Loc district, Thua Thien-Hue province | | 1,000 | JV | Management Board of Thua Thien Hue Economic and Industrial Zones; Investment Promotion and Enterprise Support Center; the Thua Thien Hue Department of Planning and Investment |
16 | Dinh An economic zone’s deep- water port | To develop the hub port of the Mekong River delta in Vietnam’s seaport system to serve the region’s freight transshipment | Dinh An economic zone | To be capable of accommodating vessels of 50,000-100,000 DWT | 1,000 | JV or 100% FDI | Tra Vinh Economic Zone Authority Add: No. 278 Bach Dang, Ward 4, Tra Vinh city, Tra Vinh province |
17 | Chau Doc-Can Tho-Soc Trang road (Chau Doc-Can Tho section) | To build the section of 200 km long, projected investment for phase 1 | Can Tho and Soc Trang provinces | Four-lane road with each lane’s width of 3.5 m and a median strip, and the road width Bn=17 m. | 869 | | Department of Public-Private Partnership, Ministry of Transport Add: 80 Tran Hung Dao, Hoan Kiem district, Hanoi Tel: 842439410775 |
18 | Ho Chi Minh City’s ring road 3 (Binh Chuan-National Highway 22-Ben Luc) | To complete the Ho Chi Minh city’s ring road system, reduce inner city traffic congestion | Long An and Binh Duong provinces, and Ho Chi Minh City | Total length of 48 km. The urban expressway (phase 1) with 4 motor lanes and 2 mixed traffic lanes | 863 | PPP | Department of Public-Private Partnership, Ministry of Transport Add: 80 Tran Hung Dao, Hoan Kiem district, Hanoi Tel: 842439410775 |
19 | Provincial road 827E | To invest in transport infrastructure | To run through 4 districts of Can Duoc, Can Giuoc, Tan Tru and Chau Thanh, Long An province | Length of 34 km; 10 lanes | 760 | PPP | Long An province’s Department of Transport Add: No. 66 Hung Vương, Ward 2, Tan An, Long An province |
20 | Chon Thanh-Dak Nong railway | The trans-Asia railway route aimed at meeting the goods transport demand of the provinces in the southern key economic region and the Central Highlands region. | Binh Phuoc and Dak Nong provinces | 67 km, gauge of 1,435mm | 715 | PPP | Binh Phuoc province’s Department of Planning and Investment Add: 626 National Highway 14, Tan Phu ward, Dong Xoai city Tel: 02713881789 |
21 | Ring road 4 (section through Long An province) | To invest in transport infrastructure | Through 3 districts of Ben Luc, Can Duoc and Can Giuoc, Long An province | Length of 32.5 km, 8 lanes | 586 | PPP | Long An province’s Department of Transport Add: No. 66 Hung Vuong, Ward 2, Tan An, Long An |
22 | Road section connecting Hoa Binh reservoir to Dong Tam and Tam Chuc tourist zones in Ha Nam province | To increase the tourism connectivity between the reservoir and other tourist zones in Ha Nam province | Hoa Binh city, and Cao Phong, Kim Boi and Lac Thuy districts | 76 km of expressway, 4 lanes | 520 | ODA, PPP | Hoa Binh province’s Department of Transport Add: No. 724, residential quarter 1, Dong Tien ward, Hoa Binh city Tel: 022183852124 Fax: 02183894771 |
23 | Van Phong international transshipment port - phase 1 | To invest in building and commercial operation of modern infrastructure of grade IA international cargo transshipment seaport | Van Thanh commune, Van Ninh district, Khanh Hoa province | The port is expected to accommodate vessels of up to 12,000 twenty-foot equivalent unit (TEUs) by 2025 and to 15 million TEUs. The area of phase 1 will be 290 ha and the port will be 4,450-5,710 m long | 500 | PPP/JV | Management Board of Van Phong economic zone, Khanh Hoa province Add: 04 - 06 Le Thanh Phuong, Nha Trang, Khanh Hoa province Tel: 02583560588 |
24 | Nghi Son port’s northern wharf | Investment in and commercial operation of sea port infrastructure | Nghi Son economic zone, Thanh Hoa province | 70 ha | 300-500 | 100% FDI; JV | Management Board of Nghi Son Economic Zone and Industrial Parks, Truc Lam ward, Nghi Son town, Thanh Hoa province Tel: 02373617237 Fax: 02373617239 |
25 | Ring road 5’s section running through Hoa Binh province | To increase the connectivity between neighboring provinces and Hanoi capital under Decision No. 561/QD-TTG of April 18, 2014 | Luong Son district, Hoa Binh province | 35.4 km of 4-lane expressway | 340 | ODA, PPP | Hoa Binh province’s Department of Transport Add: No. 724, Residential Quarter 1, Dong Tien ward, Hoa Binh city Tel: 022183852124 Fax: 02183894771 |
26 | Ring railway to the east of Hanoi: Ngoc Hoi-Lac Dao section | To connect national railways after the Yen Vien-Ngoc Hoi section is built into an urban railway | Hanoi and Hung Yen province | - Dual track railway, dual gauge of 1,435/1,000mm. - Length: 25,85km.308:308 | 335 | PPP | Department of Public-Private Partnership, Ministry of Transport Add: 80 Tran Hung Dao, Hoan Kiem district, Hanoi Tel: 842439410755 |
27 | General wharves on Con Ong island | To invest in freight and container wharves and petroleum wharf to serve import and export | Cam Thinh and Cua Ong wards, Cam Pha city | + Area: 101 ha. + Depth: more than 13 m. + Current loading and unloading capacity: 20,000 tons/year. According to the master plan: + Cam Pha general wharf: To develop general wharves to receive vessels of 30,000-50,000 tons on Con Ong island for vessels. The wharf is expected to handle 7-11 million tons of cargoes by 2030. + Liquid cargo wharf: To build petroleum piers in Cam Pha area for vessels of up to 20,000 tons. It is expected to handle 0.5-1 million tons/year by 2020 and around 2.5 million tons/year by 2030 | 305 | PPP, 100% FDI | Quang Ninh province’s Department of Transport Add: Inter-agency Head Office No. 3 Building (Cot 8 - Hong Ha - Ha Long - Quang Ninh) Tel: 0333846413 Fax: 0333846822 Email: [email protected] |
28 | Construction of piers, and Vung Ang-Son Duong logistics center | To build piers and the logistics center | Vung Ang economic zone | 100 ha | 300 | 100% FDI or joint venture | Ha Tinh Economic Zone Management Unit Add: Ky Loi commune, Ky Anh town - Ha Tinh province Tel: 0239 868699 Email: banquanlykkt [email protected]. vn |
29 | Dau Giay-Tan Phu express- way (Km 0 - Km 59 + 594 section) of Dau Giay -Lien Khuong express-way Lien Khuong | To complete the southern expressway network, synchronize the system of expressways connecting Ho Chi Minh City and Da Lat city | Dong Nai province | Total length of 60km with 4 lanes (phase 1) | 268 | PPP | Department of Public-Private Partnership, Ministry of Transport Add: 80 Tran Hung Dao, Hoan Kiem district, Hanoi Tel: 842439410755 |
30 | Inland waterway port associated with a logistics center | To build an inland waterway port | On Huu Thuong dike in the area stretching from Xuong Giang bridge to My Do bridge in Bac Giang province | 38.5ha | Depending on the investor’s funding capacity | 100% FDI | Bac Giang Investment Promotion and Enterprise Development Center Add: 164 Xuong Giang road, Ngo Quyen ward, Bac Giang city, Bac Giang province |
31 | Bac Lieu deep-water seaport | To serve transport connection and irrigation, particularly at the ending point of | 17-20 km to Bac Lieu coast in the continental edge (Vinh Hau A | To accommodate vessels of 30,000-100,000 DWT | Depending on the investor’s funding capacity | 100% FDI | People’s Committee of Bac Lieu province |
| | the Ha Tien-Rach Gia-Bac Lieu expressway; to connect to the trans-Asia route in the greater Mekong Sub-region’s transport network | commune, Hoa Binh district, Bac Lieu province) | | | | Add: No. 05, Nguyen Tat Thanh street, ward 1, Bac Lieu city Tel: 02912210677 |
32 | Thu Thiem light railway-Long Thanh international airport | To transport passengers from downtown Ho Chi Minh City to Long Thanh international airport and vice versa | Ho Chi Minh City and Dong Nai province | Building 37.35 km of railway | 174 | PPP | Department of Public-Private Partnership, Ministry of Transport Add:80 Tran Hung Dao, Hoan Kiem district, Hanoi Tel: 84 24 39410776 |
33 | Class-II logistics center | To develop cargo transport services | Hamlet 6, Kien Thanh commune, Dak R’Lap district | 20 ha | 43 | 100% FDI | People’s Committee of Dak Nong province Add: 23 March road: Gia Nghia city, Dak Nong province Tel: 02613701166 |
34 | Wharves in Lach Huyen port zone (from wharf No. 7 to wharf No. 23) | To invest in commercial operation of seaports, logistics services, etc. | Lach Huyen wharf zone in Dinh Vu economic zone - Cat Hai, Hai Phong | Each wharf is around 375 m long and consists of works protecting ports and warehouses and other auxiliary works | Depending on the investor’s funding capacity | Any form | Hai Phong Economic Zone Authority Add: No 24 Cu Chinh Lan, Hong Bang, Hai Phong city. Tel: 02253569170 |
II | INFRASTRUCTURE OF INDUSTRIAL PARKS AND ECONOMIC ZONES |
35 | Construction and commercial operation of infrastructure facilities of the industrial park in-frastructure in the north of Ben Luc district | To invest in the industrial park’s infrastructure | The northern area of Ben Luc district, Long An province | 1.500 ha | 1,740 | JV or 100% FDI | Long An Economic Zone Authority Add: 65B Chau Van Giac, Ward 2, Tan An city, Long An |
36 | Construction and commercial operation of infrastructure facilities of Ninh Co econo-mic zone | Ninh Co economic zone’s infrastructure | Hai Hau and Nghia Hung districts, Nam Dinh province | Around 13,950 ha | 1,000 | JV or 100% FDI | Nam Dinh province’s Department of Planning and Investment. Add: 172 Han Thuyen, Nam Dinh city, Nam Dinh province Tel: 02283648482 Fax: 02283647120 |
37 | Construction and commercial operation of infrastructure facilities of Hoa Binh industrial park | To build industrial park infrastructure | Hoa Ninh commune, Hoa Vang district, Da Nang city | 400.02 ha | 265 | International bidding for investor selection | Da Nang Hi-Tech Parks and IPs Management Unit Add: Lot A17, Trung Tam (Central) road, Hi-Tech Park, Hoa Lien commune, Hoa Vang district, Da Nang Tel: 02363666117 Email: [email protected] |
38 | Construction and commercial operation of infra-structure facilities of Tan Phuoc 1 Industrial Park | To invest in building, commercial operation of industrial park infrastructure | Tan Lap 1 commune, Tan Phuoc district, Tien Giang province | 470 ha | 175 | JV or 100% FDI | Tien Giang Management Board of Industrial Zones Add: No 27 Nam Ky Khoi Nghia, Ward 4, My Tho city, Tien Giang province Tel: 02733871808 |
39 | Construction of container wharves (wharves 7 and 8) | To complete Chan May port’s infrastructure, meeting the demand for cargo handling through the port | Chan May port, Thua Thien-Hue province | 20 ha/wharf | 174 | JV | Management Board of Thua Thien Hue Economic and Industrial Zones; Investment Promotion and Enterprise Support Center; Thua Thien Hue Department of Planning and Investment |
40 | Construction and commercial operation of technical infrastructure facilities of the non-tariff zone | To build governance management, trade, service, production and entertainment zones, warehouses, functional areas and other supporting areas | Dinh An economic zone, Tra Vinh province | 501 ha | 143 | JV or 100% FDI | Management Unit of Tra Vinh Economic Zone Add: No. 278 Bach Dang, Ward 4, Tra Vinh city, Tra Vinh province |
41 | Construction of infrastructure of the industrial- urban-service zone in Lap Vo district, Dong Thap province | To invest in infrastructure of the industrial park concurrently serving as the urban-service zone | Tan My commune, Lap Vo district, Dong Thap province | 500-1,000 ha | 130 | Joint venture or 100% FDI | Dong Thap province’s Department of Planning and Investment. Add: No. 11, Vo Truong Toan street, Ward 1, Cao Lanh city, Dong Thap province Tel: 02773851101 Fax: 02773852955 Email: [email protected] |
42 | Construction and commercial operation of infrastructure of Tan Phuoc 2 Industrial Park | To invest in construction and commercial operation of infrastructure of the industrial park | Tan Lap 2 commune, Tan Phuoc district, Tien Giang province | 300 ha | 110 | Joint venture or 100% FDI | Tien Giang Industrial Zones Management Board Add: No. 27, Nam Ky Khoi Nghia street, Ward 4, My Tho city, Tien Giang province Tel: 02733871808 |
43 | Construction and commercial operation of infrastructure of the industrial- urban-service park located along the Bac Giang-Lang Son express-way in Huu Lung district, Lang Son province | To develop industrial, urban and service infrastructure | 7 communes: Hoa Lac, Cai Kinh, Hoa Son, Tan Thanh, Ho Son, Hoa Thang and Minh Hoa, Huu Lung district, Lang Son province | 5,000 ha | 100 | 100% FDI or joint venture | Lang Son province’s Department of Planning and Investment Add: No. 2, Hoang Van Thu street, Chi Lang ward, Lang Son city Tel: 0253812122 Fax: 0253811132 Email: [email protected] |
44 | Construction and commercial operation of technical infrastructure of Hon La II Indus-trial Park | To invest in completely uilding infrastructure of the industrial park to meet the needs of investors, such as mechanical engineering and manufacturing industry, agro-forestry-fisheries and food processing industry; production of consumer goods; textile, leather, footwear, etc. | Hon La economic zone, Quang Trach district, Quang Binh province | 180 ha | 100 | 100% FDI or joint venture | Quang Binh Economic Zone Authority Add: No. 117, Ly Thuong Kiet street, Dong Hoi city, Quang Binh province Tel: 02323828513 Fax: 02323828516 |
45 | Investment in construction and commercial operation of infrastructure of Phu Binh Industrial Park | To invest in building and commercially operate infrastructure of Phu Binh Industrial Park | Duc Trong district, Lam Dong province | 246 ha | 85 | Joint venture or 100% FDI | 1. Lam Dong province’s Industrial Park Management Board Add: Administrative Center of Lam Dong province, No. 36, Tran Phu street, Da Lat city, Lam Dong province Tel: 02633549103 - 02633549106 2. Lam Dong province’s Investment, Trade and Tourism Promotion Center Add: No. 02 - 04, Tran Quoc Toan street, Ward 3, Da Lat city, Lam Dong province Tel: 02633832964 Fax: 02633811656 |
46 | Construction and commercial operation of infrastructure of Van Ho Industrial Park | To completely build infrastructure of Van Ho Industrial Park | Thuong Cuong village, Van Ho commune, Van Ho district, Son La province | 240 ha | 73 | 100% FDI or joint venture | Son La province’s Department of Planning and Investment Add: 6th Floor, 9-story building, Administrative Center, residential quarter 7, To Hieu ward, Son La city, Son La province; Tel: 02123859938 Fax: 02123852032 Email: [email protected] |
47 | Construction and commercial operation of infrastructure of Muong So Industrial Park | - To build Muong So Industrial Park into an industrial-service center of Phong Tho district, thus helping restructure the economy toward rapidly increasing the proportion of the industrial sector in the overall structure of the local economy. - To form a typical model of centralized industrial management for the province’s industrial development. | Muong So commune, Phong Tho district, Lai Chau province | To level construction ground and invest in synchro-nously building technical infrastructure in the Indus-trial Park (including internal roads, electricity and water systems, and wastewater collection and treatment system, etc.) with an area of 220 ha. | 65 | 100% FDI | People’ Committee of Lai Chau Add: Tan Phong ward, Lai Chau city Tel: 02133876359 Fax: 02133876356 |
48 | Construction and commercial operation of infrastructure of the expanded Binh Long Industrial Park | To build and commercially operate infrastructure of the Industrial Park | Chau Phu district, An Giang province | 120 ha | 50 | 100% FDI or joint venture | An Giang province’s Economic Zone Management Board Add: No 02. Road 20, My Hoa ward, Long Xuyen city Tel: 02963941583 Fax: 02963943624 |
49 | Construction and commercial operation of technical infrastructure of Phu Da Industrial Park | To invest in building and commercially operating infrastructure of the Industrial Park | Phu Da Industrial Park, Phu Vang district, Thua Thien Hue province | 165 ha | 50 | Joint venture | Management Board of Thua Thien Hue Economic and Industrial Zones; Investment Promotion and Enterprise Support Center of Thua Thien Hue province’s Department of Planning and Investment |
50 | Construction and commercial operation of technical infrastructure of Lang Tram Industrial Park | To invest in completely and synchronously building technical infrastructure of the Industrial Park in order to attract investment projects in the Industrial Park | Gia Rai town, Bac Lieu province | 103.53 ha, including: - Industrial Park: 94.19 ha; - Resettlement area and accommodations for workers: 9.34 ha. | 39 | 100% FDI or PPP | Bac Lieu province’s Industrial Park Management Board Add: No. 48, Ba Trieu street, Ward 3, Bac Lieu city, Bac Lieu province |
51 | Construction and commercial operation of infrastructure of the industrial park for production of materials and auxiliary materials for the garment and textile industry | To invest in infrastructure | Chu Lai Open Economic Zone | 200 ha | 30.4 | Joint venture or 100% FDI | Management Board of Chu Lai Open Economic Zone Add: Le Thanh Ton street, An Phu ward, Tam Ky city Tel: 02353812849 |
52 | Construction and commercial operation of technical infrastructure of the bonded warehouse site | To build and develop Dinh An Economic Zone with the key industries linking marine industries with such industries as power generation, development of industries in support of other industries, shipbuilding industry, other heavy industries, etc | Dinh An Economic Zone, Tra Vinh province | 101 ha This site, together with 1 dock, will deal with loading/unloading, packing and transshipping goods from Long Toan and Tra Cu ports to industrial parks | 29 | Joint ventureor 100% FDI | Tra Vinh province’s Economic Zone Management Board Add: No. 278, Bach Dang street, Ward 4, Tra Vinh city, Tra Vinh province |
53 | Construction and commercial operation of infrastructure of Giao Hoa Industrial Park | To build and commercially operate infrastructure of the Industrial Park | Giao Hoa commune, Chau Thanh district, Ben Tre province | 248.51 ha | Depending on the invesor’s funding capacity | Any form | Ben Tre province’s Investment Promotion and Startup Center Add: No. 28, Le Dai Hanh street, An Hoi ward, Ben Tre city, Ben Tre province Tel: 02753 575690 Fax: 02753 825340 Email: [email protected] |
54 | Construction and commercial operation of infrastructure of Phuoc Long Industrial Park | To build and commercially operate infrastructure of the Industrial Park | Phuoc Long commune, Giong Trom district, Ben Tre province | 182.32 ha | Depending on the investor’s funding capacity | Any form | Ben Tre province’s Investment Promotion and Startup Center Add: No. 28, Le Dai Hanh street, An Hoi ward, Ben Tre city, Ben Tre province Tel: 02753 575690 Fax: 02753 825340 Email: [email protected] |
55 | Construction and commercial operation of infrastructure of the non-tariff area of Nam Can Economic Zone | To invest in construction of technical infrastructure of the non-tariff area, meeting the requirements of secondary investment projects in Nam Can Economic Zone in the industral, trade and service sectors | Nam Can township, Nam Can district, Ca Mau province | 800 ha | Depending on the investor’s funding capacity | Joint ventureor 100% FDI | Ca Mau province’s Economic Zone Management Board Add: 91-93, Ly Thuong Kiet street, Ward 5, Ca Mau city |
56 | Construction and commercial operation of infrastructure of Song Hau Industrial Park | To build infrastructure of the Industrial Park | An Lac Thon town, Ke Sach district, Soc Trang province | 286 ha | Depending on the investor’s funding capacity | 100% FDI | Soc Trang province’s Industrial Park Management Board Add: Km 2126+500, N2 Road, An Nghiep Industrial Park, Soc Trang province |
57 | Construction and commercial operation of infrastructure of My Thanh Industrial Park | To build infrastructure of the Industrial Park | Vinh Hai commune, Vinh Chau town, Soc Trang province | 217 ha | Depending on the investor’s funding capacity | 100% FDI | Soc Trang province’s Industrial Park Management Board Add: Km 2126+500, N2 Road, An Nghiep Industrial Park, Soc Trang province |
58 | Construction and commercial operation of infrastructure of Quyet Thang Industrial Park | To build infrastructure of the Industrial Park to attract domestic and foreign investment | Thai Nguyen city and Dai Tu district, Thai Nguyen province | 105 ha | Depending on the investor’s funding capacity | Joint venture or 100% FDI | Thai Nguyen province’s Industrial Park Management Board Add: Bach Quang ward, Song Cong city, Thai Nguyen province Tel: 02083845435 Fax: 02083845434 |
III | ENERGY INFRASTRUCTURE |
59 | Petrochemical and new plastic material production complex | To invest in the petrochemical and new plastic material production plant | Nghi Son Economic Zone, Thanh Hoa province | 2 million tons of PE and PP/year | 4.000-6.000 | 100% FDI | Management Board of Nghi Son Economic Zone and Industrial Parks Add: Truc Lam ward, Nghi Son town, Thanh Hoa province Tel: 02373617237 Fax: 02373617239 |
60 | Gas-fired power plant | To generate electricity by using LPG; to promote the development of the province’s energy industry | Hon La Economic Zone, Quang Trach district, Quang Binh province | Project scale: 100-200 ha; capacity: 3,000 MW | 4,000 | 100% FDI or joint venture | Quang Binh province’s Department of Planning and Investment Add: No. 23/8 street, Dong Hoi city, Quang Binh province Tel: 02323822270; Fax: 02323821520 |
61 | Long An Thermal Power Center | To invest in plants in the Thermal Power Center | Long Huu Dong commune, Can Duoc district, Long An province | About 3,000 MVA | 3,000 | Joint venture or 100% FDI | Long An province’s Department of Industry and Trade Add: No. 112, August Revolution street, Ward 1, Tan An city, Long An province |
62 | Wind Power Plant in Tuy Duc district | To generate, transmit and distribute electricity | Communes: Quang Truc, Dak Buk So, Dak R’Tih | Capacity: 500 MWp | 740 | 100% FDI | People’ Committee of Dak Nong province Add: March 23 street, Gia Nghia city, Dak Nong province Tel: 02613701166 |
63 | Solar Power Plant in Krong No district | To generate, transmit and distribute electricity | Communes: Duc Xuyen, Buon Choah, Quang Phu, Dak Dro and Nam Da | Capacity: 800 MWp | 520 | 100% FDI | People’s Committee of Dak Nong province Add: March 23 street, Gia Nghia city, Dak Nong province Tel: 02613701166 |
64 | Gas pipeline system from Bao Vang gas field to Quang Tri province | To build a gas pipeline system from Bao Vang gas field to Quang Tri province in order to supply gas to a 340MW gas-fired thermal power plant with Gazprom EP International B.V (Republic of the Federation of Russia) acting as the project owner in the Southeastern Quang Tri Economic Zone (approved by the Prime Minister in Document No. 717/TTg-CN of June 13, 2019) | The landing points are located in Hai An and Hai Khe communes, Hai Lang district, belonging to the Southeastern Quang Tri Economic Zone | 2-3 billion m3/year; 120 km long; 16 inches in diameter | 216 | Joint venture or 100% FDI | Quang Tri province’s Department of Industry and Trade; Add: 313, Hung Vuong street, Dong Ha city, Quang Tri province Tel: 02333852514; 02333852265 Fax: 02333852265 Email: [email protected] |
65 | Solar cell plant in Tam Da-Hao Phu industrial cluster | To develop industrial production in order to generate state budget revenues and stable jobs for local workers | Tam Da and Hao Phu communes, Son Duong district, Tuyen Quang province | To manufac-ture and assemble solar cells with a capacity of 1GW and silicon panels of a capacity of 1GW | 108 | 100% FDI or joint venture | People’s Committee of Son Duong district, Tuyen Quang province Add: Son Duong township, Son Duong district, Tuyen Quang province |
IV | INFORMATION TECHNOLOGY INFRASTRUCTURE |
66 | Dedicated and auxiliary factory for information and commu-nications technology (ICT) of Da Nang Information Technology Park | To build the dedicated factory for manufacturing ICT auxiliary components | Da Nang Information Technology Park | Area: 57,7 ha. factory of 2-6 stories, building density of 40% | 217 | Joint venture or 100% FDI | Da Nang Investment Promotion Agency Add: 18th Floor, Administrative Center, 24 Tran Phu street, Da Nang city Tel: 02363886243 Fax: 02363810056 Email: [email protected] Website: www.investdanang.gov.vn |
67 | Data Center and office complex, information technology display and exhibition hall of Da Nang Information Technology Park | Office complex in combination with the Data Center and information technology display and exhibition hall | Da nang Information Technology Park | Covering an area of 8.7 ha, including four 26-story office building complexes in combination with the Data Center, display hall, and fair and exhibition hall, etc. | 158 | Joint venture or 100% FDI | Da Nang Investment Promotion Agency Add: 18th Floor, Administrative Center, 24 Tran Phu street, Da Nang city Tel: 02363886243 Fax: 02363810056 Email: [email protected] Website: www.investdanang.gov.vn |
68 | Construction and commercial operation of infrastructure of Da Nang Information Technology Park | Infrastructure of Da Nang Information Technology Park - phase 2 | Da Nang Information Technology Park | 210 ha | 73 | Joint venture or 100% FDI | Da Nang Investment Promotion Agency Add: 18th Floor, Administrative Center, 24 Tran Phu street, Da Nang city Tel: 02363886243 Fax: 02363810056 Email: [email protected] Website: www.investdanang.gov.vn |
69 | R&D zone and Da Nang Information Technology Park | To build an R&D zone | Da Nang Information Technology Park | Area: 21 ha. Height: 6-10 storiesbuil-ding density of 40% | 43 | Joint venture or 100% FDI | Da Nang Investment Promotion Agency Add: 18th Floor, Administrative Center, 24 Tran Phu street, Da Nang city Tel: 02363886243 Fax: 02363810056 Email: [email protected] Website: www.investdanang.gov.vn |
70 | Construction and commercial operation of infrastructure of Yen Binh Information Technology Park | To build a modern and synchronous technical infrastructure system to attract large domestic and foreign investors in ICT projects | Pho Yen town and Phu Binh district, Thai Nguyen province | 545.82 ha | 185 | Joint venture or 100% FDI | Thai Nguyen province’s Department of Information and Communications of Add: No. 5, Nha Trang street, Trung Vuong ward, Thai Nguyen city, Thai Nguyen province. Tel: 02083655369 Fax: 02083655336 Email: [email protected] |
71 | Can Tho Information Technology Park | To build Can Tho Information Technology Park into a center for providing information technology infrastructure, human resources and services for the development of information technology in Can Tho city and the Mekong River Delta, covering high-rise buildings in 3 land lots A, B and C with the building density of 46.45% | Hung Thanh ward, Cai Rang district, Can Tho city | an ICT human resource training hall (9,990 m2); and an area for IT exhibition hall, convention center, conference hall, and trade center (7,164 m2) * Zone C, serving as a technical infrastructure land area (10,167 m2) including the parking lot, power generation station, wastewater treatment system); housing for housing for experts (12,629 m2), school (3,482 m2); greenery park (28,564 m2); and roads (66,479 m2) | 21.1 | Joint venture or 100% FDI | Can Tho city’s Department of Information and Communications Tel: 02923811502 Fax: 02923811502 Email: [email protected] |
72 | Project to manufacture products and equipment with application of AI, Robotic, IOT, SmartCity, new-generation battery technologies, etc. | - To manufacture electronic and ICT products meeting domestic and export demands. - To make linkages or connections among markets, investors and research groups inside and outside Hoa Lac Hi-Tech Park; to create supply chains in the fields of electronics and ICT. | Hoa Lac Hi-Tech Park, Hanoi | Products and equipment that are manufactured with application of AI, Robotic, IOT, SmartCity, new generation battery technologies, etc. | Depending on the investor’s funding capacity | Joint venture or 100% FDI | Hoa Lac Hi-Tech Park Management Board Add: Km29, Thang Long Boulevard, Thach That district, Hanoi Email: [email protected] Tel: 02463269295 Fax: 02463269290 |
73 | Project to manufacture pharmaceuticals, cosmetics, and functional foods with application of biotechnology | - To make high-quality products and commodities from natural substances, especially medicinal herbs in Vietnam, from extracts or finished-product preparations, under the guidance of the World Health Organization, to meet the people’s health protection, care and improvement. - To make linkages or connections among domestic raw material sources, investors and research groups inside and outside Hoa Lac Hi-Tech Park; to create supply chains from raw materials being domestic natural products. | Hoa Lac Hi-Tech Park, Hanoi | Pharmaceutical products, cosmetics, and functional foods meeting the standards and quality requirements of international organizations | Depending on the investor’s funding capacity | Joint venture or 100% FDI | Hoa Lac Hi-Tech Park Management Board Add: Km29, Thang Long Boulevard, Thach That district, Hanoi Email: [email protected] Tel: 02463269295 Fax: 02463269290 |
74 | Project to manufacture industrial machinery and equipment up to international standards | - To manufacture industrial machinery and equipment to meet domestic and export needs. - To make linkages or connections among markets, investors and research groups inside and outside Hoa Lac Hi-Tech Park; to create supply chains in the field of manufacturing of industrial machinery and equipment in Hoa Lac Hi-Tech Park. | Hoa Lac Hi-Tech Park, Hanoi | Industrial machinery and equipment meeting standards and quality requirements of international organizations | Depending on the investor’s funding capacity | Joint venture or 100% FDI | Hoa Lac Hi-Tech Park Management Board Add: Km29, Thang Long Boulevard, Thach That district, Hanoi Email: [email protected] Tel: 02463269295 Fax: 02463269290 |
V | GARBAGE AND WASTEWATER TREATMENT SYSTEMS |
75 | Domestic solid waste treatment plant | To treat municipal solid waste | Solid Waste Treatment Complex, Hoa Khanh Nam ward, Lien Chieu district, Da Nang city | 1,000 tons per day | 130 | 100% FDI; or PPP | Department of Natural Resources and Environment of Da Nang city Add: 15th Floor, Administrative Center, 24 Tran Phu street, Da Nang city Email: [email protected] |
76 | Water supply and waste treatment system of Long Khanh city | To build a wastewater collection and treatment system to ensure rainwater drainage and wastewater treatment in the city and improve environmental sanitation conditions, contributing to improving and developing infrastructure of Long Khanh city | Long Khanh city, Dong Nai province, including the 6 central wards of Xuan Trung, Xuan Thanh, Xuan Hoa, Xuan An, Xuan Binh and Phu Binh and 3 communes of Bau Sen, Suoi Tre and Bao Vinh. | Rainwater drainage system: - Construction and renovation of the water supply and serage system with a diameter of 400-2,000 mm (circular culverts) and culverts with dimension B x H = 2,500 x 2,000mm, total length of 46.8 km Wastewater collection and treatment system: - Construction of the wastewater treatment station, phase 1 (by 2030) and phase 2 (by 2040) with a capacity of 13,000 m3/day. Treatment process: A2O (anaerobic, anoxic, oxic), ensuring that treated wastewater reaches grade-A criteria according to QCVN40: 2011 - Construction of the network of waste-water collection sewers with a diameter of 200-600 mm with a total length of about 66: construction of 3 transfer pumping stations and some manhole pumping stations. | 127 | Joint venture or 100% FDI | Dong Nai province’s Management Board for Construction Investment Projects Add: No. 15A, Ha Huy Giap street, Quyet Thang ward, Bien Hoa city, Dong Nai province Tel: 02518878899 |
77 | Concentrated household waste treatment plant of Vinh Phuc province | To treat household wastes generated in the province with the treatment capacity of 300 tons of household waste/day, which may be increased to 500 tons/day | Trung My commune, Binh Xuyen district, Vinh Phuc province | 300-500 tons/day, using the power-generating incineration technology with the percentage of landfilled wastes of below 10% | 57 | PPP or 100% FDI | Vinh Phuc province’s Department of Planning and Investment. Add: No. 40, Nguyen Trai street, Dong Da ward, Vinh Yen city, Vinh Phuc province. Tel: 02113862480 Email: [email protected] |
78 | Water drainage system and wastewater treatment plant of Tuyen Quang province | To build a modern and synchronous water drainage system and wastewater treatment plant to create a modern urban landscape, reduce environmental pollution, and reuse water resources | Cha stream valley, Tan Quang and Hung Thanh wards, Tuyen Quang city | 10,000-20,000 m3/day | 50 | PPP | Tuyen Quang province’s Investment Promotion Center. Add: No. 4, road 17/8, Minh Xuan ward, Tuyen Quang city |
79 | Wastewater collection and treatment system of Nam Dinh city | To invest in a wastewater collection and treatment system in the city | Nam Dinh city, Nam Dinh province | 27,000 m3/day | 45 | Joint venture or ODA | People’s Committee of Nam Dinh city Add: No. 10, Tran Dang Ninh road, Nam Dinh city Tel: 02283849224 Fax: 02283831922 Email: [email protected] |
80 | Household wastewater treatment system of Kon Tum city | - To collect at least 80% of the household wastewater volume separately from the rainwater collection system in inner wards of Kon Tum city. - To ensure the treated household wastewater up to the criteria specified in column A of QCVN14: 2008/BTNMT - National technical regulation on household wastewater before it is discharged into receiving sources | Kon Tum city, Kon Tum province | 40,000 m3/day. Technical data: - To build 2 concentrated household wastewater stations (of which the station located in the north of Dak Bla river has the capacity of 28,000 m3/day; the station located in the south of Dak Bla river has the capacity of 12,000 m3/day) applying the activated sludge and waste stabilization pond technologies to ensure quality of treated wastewater up to the criteria specified in Column A of QCVN14: 2008/BTNMT. - To build 20 pumping stations - To install the network of D300 and D1,500 reinforced concrete pipelines, HDPE plastic pipelines or black steel pipelines with the total length of 84,900 m. | 35 | PPP | Kon Tum province’s Department of Construction Add: No. 345, Ba Trieu street, Quyet Thang ward, Kon Tum city, Kon Tum province Tel: 02603862549 Fax: 02603863800 |
81 | Sewerage system and concentrated wastewater treatment station in Phuc Yen city | To build the sewerage system and concentrated wastewater treatment station in in Phuc Yen city | Phuc Yen city, Vinh Phuc province | 12,500 m3/day | 35 | PPP or 100% FDI | Vinh Phuc province’s Department of Planning and Investment. Add: No. 40, Nguyen Trai street, Dong Da ward, Vinh Yen city, Vinh Phuc province Tel: 02113862480 Email: [email protected] |
82 | Solid waste treatment plants in the northern and southern areas of Thai Binh province | To serve waste treatment and environmental protection | Thai Binh city, Dong Hung and Kien Xuong districts, Thai Binh province | Under the investor’s specific projects | 20 | 100% FDI or joint venture | Thai Binh province’s Department of Planning and Investment. Add: No. 233, Hai Ba Trung road, Thai Binh city, Thai Binh province Tel: 02273830460 |
VI | EDUCATIONAL AND MEDICAL INFRASTRUCTURE |
83 | Construction of a 1,000-bed general hospital within the investment project to construct the Hanoi National University in Hoa Lac | To build a modern general hospital up to international standards to serve training activities of the Vietnam National University, Hanoi, and public services | Within the premises of the university-urban center of the Hanoi National University in Hoa Lac (Thach Hoa commune, Thach That district, Hanoi) | 18.5 ha, and with 1,000 patient beds | 178 | 100% FDI | Hanoi National University Add: No. 144 Xuan Thuy road, Cau Giay district, Hanoi Tel: 0243.7547670 (ext: 503) |
84 | Construction of the International School of the Hanoi National University | - To build the high-quality International School, contributing to improving the model and structure, and create a breakthrough in the development of the Vietnam National University, Hanoi, renovating the education and training sector, and developing the national science and technology. - To organize training, scientific research and technology transfer based on international inspection standards and basic science, applied science, interdisciplinary science and knowledge transfer; to provide human resources and high-quality science and technology products up to international standards serving the national development. - To build an institution to attract scientists, experts, and international students to come to work and attract universities around the world to open their representative offices. - To contribute to improving efficiency of Vietnam’s international integration process | Within the premises of the university-urban center of the Hanoi National University in Hoa Lac (Thach Hoa commune, Thach That district, Hanoi) | 9,22 ha | 62.5 | 100% FDI | Hanoi National University Add: No. 144 Xuan Thuy street, Cau Giay district, Hanoi Tel: 02437547670 (ext: 503) |
85 | Construction of the hospital of the Vietnam National University, Ho Chi Minh City | - To build a high-quality hospital in the form of university hospital with a modern 500-bed general hospital under the Faculty of Medicine. - To establish a training system of the Faculty of Medicine, practice hospitals and scientific research institutes; to create an environment for training in association with friendly medical examination and treatment and sustainable and advanced development. - To develop the Faculty of Medicine into the University of Health Sciences toward the most modern advanced training model in the world, in association with expansion of the University Hospital of the Vietnam National University, Ho Chi Minh City, taking advantage of the model of university hospital to focus on medical knowledge for medical care and treatment, to study and absorb the latest medical knowledge and develop different types of healthcare services; to achieve the target of becoming a medicine and medical treatment center up to Vietnam’s and international standards | Within the premises of the university-urban center of the Vietnam National University, Ho Chi Minh City | Scale: 500 beds Work type: Medical facility Construction work level: Level I | 87 | 100% FDI or PPP | Vietnam National University, Ho Chi Minh City Add: Linh Trung ward, Thu Duc city, Ho Chi Minh City Tel: 02837242181 (ext: 1371) |
86 | Production of pharmaceuti-cal products and medical equipment | To produce pharmaceutical products and medical equipment | Industrial parks in Phu Tho province | 10-20 ha | 44-87 | 100% FDI | Phu Tho province’s Department of Planning and Investment Add: No. 398, Tran Phu road, Tan Dan ward, Viet Tri city, Phu Tho province |
87 | International hotel | To invest in the health care sector | Thang Binh district | 100 ha | 65.2 | 100% FDI or joint venture | Quang Nam province’s Department of Planning and Investment Add: No. 02, Tran Phu road, Tam Ky city Tel: 02353810934 |
88 | High-quality university | To invest in a high-quality university | Nam Cao university zone, Duy Tien commune and Phu Ly city, Ha Nam province | 252 ha (for admission of 5,000-10,000 students) | 29-57 | Any form | Ha Nam province’s Department of Planning and Investment Add: No. 15, Tran Phu road, Phu Ly city, Ha Nam province Tel: 02263852701 Fax: 02263852701 |
89 | Upgrading of the Tuyen Quang General Hospital, and 2 heath centers of Yen Son and Ham Yen districts | To satisfy local people’s demand for medical examination and treatment | Tan Ha ward, Tuyen Quang city, Tuyen Quang province | 660 patient beds | 50 | PPP | Tuyen Quang province’s Department of Health Address: No. 1, Dinh Tien Hoang road, Tan Quang ward, Tuyen Quang city |
90 | Plant for processing of products from materia medica in association with development of areas for production of materia medica | To create concentrated material areas in association with processing | Moc Chau, Van Ho, Yen Chau, Thuan Chau, Phu Yen, Bac Yen Muong La and Quynh Nhai districts, Son La province | | 48 | 100% FDI or joint venture | Son La province’s Department of Planning and Investment Add: Floor 6, Nine-floor Department, the Administrative Center, residential quarter 7, To Hieu ward, Son La city, Son La province Tel: 02123859938 Fax: 0212385032 Email: [email protected] |
91 | Planting and development of Lai Chau ginseng in Phong Tho and Muong Te districts | - To form a special and large-scale materia medica production zone in Lai Chau province in order to turn the province’s Lai Chau ginseng into a national-brand product. - To take advantage of the province’s potential in geographical position, climate, terrain, population and labor to create great and breakthrough economic value to lead to a change in the province’s social structure. | Sin Suoi Ho commune, Phong Tho district; Thu Lum, Pa Ve Su and Ka Lang communes, Muong Te district, Lai Chau province | On a total area of more than 1,000 ha under the natural forest canopy | 22 | 100% FDI | People’s Committee of Lai Chau province Address: Tan Phong ward, Lai Chau city Tel: 02133876359 Fax: 02133876356 |
92 | Plant for manufac-turing pharmaceu-tical products and materia medica | To plant and process materia medica for domestic consumption and export | Bac Kan city, Bac Kan province | 200 ha | 20 | Joint venture or 100% FDI | Bac Kan province’s Department of Plan-ning and Investment Add: No. 9, Truong Chinh road, Bac Kan city, Bac Kan province Tel: 0912149180/ 02093 870136 Fax: 02093871287 |
VII | CULTURE, SPORTS AND TOURISM INFRASTRUCTURE |
93 | Eastern Tam Dao eco-tourism urban center | To build the eastern Tam Dao eco-tourism urban center for spatial, cultural and infrastructure connection with the western area of the Tam Dao National Park and Nui Coc Lake Tourism Zone, ensuring the overall linkage of urban, tourism and service spaces, exploitation and conservation of natural beauty and bio-diversity, sustainable development, thereby generating a driving force for socio-economic development of Pho Yen town, Thai Nguyen province, adjacent provinces, and the Hanoi Metropolitan Area | Bac Son ward, Dan Son, Van Phai, Thanh Cong and Phuc Thuan communes, and Pho Yen town, Thai Nguyen province | 1. On a total area of around 5,619 ha 2. Main functions of the urban center: - Serving as an ecological urban center: Renovation of existing villages; new ecological residential areas; and building of public urban and residential areas, and commercial and service centers. - Eco-tourism zones, entertainment centers. - Cultural tourism zones: water parks, art gardens, etc. - Theme parks: sports parks, golf courses. - Agri-tourism destinations | 1,610 | Any form | Thai Nguyen province’s Department of Construction Add: Nguyen Du road, Trung Vuong ward, Thai Nguyen city |
94 | Luxurious service, commercial, entertainment complex and smart urban center | To invest in a service, commercial, entertainment complex and smart urban center, and hi-tech agricultural projects | My Loc district, Nam Dinh province | 1,500 ha | 1,300 | 100% FDI or joint venture | Nam Dinh province’s Department of Planning and Investment Add: No. 172 Han Thuyen, Nam Dinh city, Nam Dinh province Tel: 02283648482 Fax: 02283647120 |
95 | Ayun Ha lake eco-tourism site | To promote the development of the tourism and service sector of the province, contributing to the province’s economic restructuring | Phu Thien district, Gia Lai province | 20 ha of land area in Chu A Thai commune and water surface of Ayun Ha lake | 690 | Bidding for investor selection | Gia Lai province’s Department of Planning and Investment Add: No. 02, Hoang Hoa Tham street, Pleiku city, Gia Lai province Tel: 02693824414 |
96 | Bien Ho-Chu Dang Ya tourism site | To promote the development of the tourism and service sector of the province, contributing to the province’s economic structuring | Pleiku city, Chu Pah district, Gia Lai province | 6,000 ha | 217 | Bidding for investor selection | Gia Lai province’s Department of Planning and Investment Add: No. 02, Hoang Hoa Tham street, Pleiku city, Gia Lai province Tel: 02693824414 |
97 | Hoa Lung lake eco-tourism site | To develop tourism, generate revenues, and create favorable conditions for socio-economic development of the province; to attract capable investors to bring into full play tourism potential of Son Duong district | Dai Phu commune, Son Duong district, Tuyen Quang province | To build entertainment centers, resorts, restaurants, speciality shops; and foodstuff preparing areas for food catering | 200 | 100% FDI | People’s Committee of Son Duong district, Tuyen Quang province Add: Son Duong township, Son Duong district, Tuyen Quang province |
98 | Luxurious complex of resorts, entertainment centers and urban center in Yen Trung lake area | To form an attractive tourism destination with resorts, providing cultural experience, sports and entertainment facilities in conformity with the Scheme on expansion and development of the Yen Tu complex of monuments and landscapes, and orientations for general planning of Uong Bi city | Yen Trung lake area, Phuong Dong ward, Uong Bi city, Quang Ninh province | 566.04 ha | 110 | 100% FDI | People’s Committee of Uong Bi city, Quang Ninh province. Add: No. 3, Tran Hung Dao street, Thanh Son district, Uong Bi city, Quang Ninh province |
99 | Complex of resorts and five-star hotels | To invest in tourism development | Thien Cam and Cam Xuyen townships; and Xuan Thanh commune, Nghi Xuan district, Ha Tinh province | To be determined upon project formulation | 100 | 100% FDI or joint venture | Ha Tinh province’s Department of Planning and Investment. Add: No. 16, Xo Viet Nghe Tinh road, Nguyen Du ward, Ha Tinh city, Ha Tinh province |
100 | Smart trade center combined with entertainment center for local people and tourists in Dong Hoi city/Phong Nha-Ke Bang National Park | To develop a smart commercial center in association with entertainment center serving local people and tourists in Dong Hoi city/Phong Nha-Ke Bang national park | Dong Hoi city/Phong Nha-Ke Bang national park, Quang Binh province | 3-5 ha | 50-100 | 100% FDI or joint venture | Quang Binh province’s Department of Planning and Investment Add: Road 23/8, Dong Hoi city, Quang Binh province Tel: 02323822270 Fax: 02323821520 |
101 | Con Vanh eco-tourism site | To build a modern marine eco-tourism site | Thai Binh economic zone, Nam Phu commune, Tien Hai district, Thai Binh province | Under the investor’s specific project | 100 | 100% FDI or joint venture | Thai Binh province’s Economic Zone and Industrial Park Management Board Add: Ngo Gia Kham road, Phuc Khanh industrial park, Phu Khanh ward, Thai Binh city |
102 | Sin Ho plateau tourism site | - To develop different types of eco-tourism, resort, healthcare, beauty care, sports, and entertainment to create a special impression of image of Lai Chau province’s people. - To develop a green and resort urban center in Sin Ho township in association with a high-quality materia medica and agricultural production area. - To create a landmark of tourism for Lai Chau province, form linkages for development of tours in the province and along the “northwestern loop” route. | Sin Ho township and adjacent communes, Sin Ho district, Lai Chai province | - On a total area of around 500 ha - To invest in technical infrastructure facilities (Transport, electricity and water supply systems) - To construct resorts and hotels of at least 3 stars and with 100-200 rooms, trade centers, restaurants, sports centers, entertainment, healthcare, and herbal bath facilities | 87 | 100% FDI | People’s Committee of Lai Chau province Add: Tan Phong ward, Lai Chau city Tel: 02133876359 Fax: 02133876356 |
103 | Eco-tourism site of Xuan Thuy National Park | To invest in infrastructure facilities of and commercially operate an eco-tourism site and resort | Giao Thuy district, Nam Dinh province | 2,000 ha | 70 | 100% FDI or joint venture | Nam Dinh province’s Department of Planning and Investment Add: No. 172, Han Thuyen street, Nam Dinh city, Nam Dinh province Tel: 02283648482 Fax: 02283647120 |
104 | Khe Sanh lake culture and tourist park | To build a public park to serve local people’s daily activities, sports, and leisure and provide commercial services | Khe Sanh township, Quang Tri province | 52 ha | 45 | New construction | People’s Committee of Huong Hoa district, Quang Tri province Add: No. 148, Le Duan street, Khe Sanh township, Huong Hoa city, Quang Tri province |
105 | Y Ty resort and tourism urban area, Bat Xat district | To build basic infrastructure facilities to meet sightseeing and leisure needs, thus promoting tourism development in Y Ty commune | Sub-zones 3 and 5 under the general plan on Y Ty tourism area, Bat Xat district, Lao Cai province | 155.1 ha (79 ha in sub-zone 3 and 76.1 ha in sub-zone 5) | 30 | 100% FDI and joint venture | People’s Committee of Bat Xat district, Lao Cai province. Add: Bat Xat township, Bat Xat district, Lao Cai province |
106 | Con Oc community-based eco-tourism and culture site | To build a tourism site of specialized coconut plantations and handicraft villages making products from coconut materials, for introduction of rural folk culture and provision of food catering, accommodations, sightseeing and entertainment services for tourists | Hung Phong commune, Giong Trom district, Ben Tre province | On an estimated area of 200 ha, with investment possibly made in separate projects | Depending on the investor’s funding capacity | Any form | The Startup and Investment Promotion Center of Ben Tre province Add: No. 28, Le Dai Hanh street, An Hoi ward, Ben Tre city, Ben Tre province Tel: 02753575690 Fax: 02753825340 Email: [email protected] |
VIII | Agriculture, forestry, and aquaculture |
107 | Project on construction of centralized aquatic breed production area at Bung islet in Thanh Hai commune, Thanh Phu district | To control the quality of aquatic breed products before supplying to farmers; to control diseases with new technologies, contributing to meeting the demand for good aquatic breeds for the province’s | To be located in Thanh Hai commune, Thanh Phu district, Ben Tre province, 78km away from Ben Tre city and 90km away from Rach Mieu bridge, covering an area of 15ha. | 15ha, to transfer and apply advanced technological processes for producing disease-free aquatic breeds to production of aquatic | Selected by investors | Any form | Ben Tre province’s Startup and Investment Promotion Center Add: No. 28 Le Dại Hanh, An Hoi ward, Ben Tre city, Ben Tre province Tel: 02753 575690 Fax: 02753 825340 Email: [email protected] |
| | aquaculture and gradually reducing risks for the aquaculture sector due to failure to supervise the quality of aquatic breeds. | | breeds in the province in order to sustainably develop aquatic breed production, step by step meeting the demand for aquatic breeds for the province’s aquaculture. | | | |
108 | Exported pork processing complex | To invest in animal feed production and pork processing plants | Nghi Son Economic Zone, Thanh Hoa province | - Pig farm of 5 million heads/year - Mixed animal feed plant with a capacity of 2 million tons/year - Slaughter-house and pork processing plant with a capacity of 600,000 tons/year | 1,000-3,000 | 100% FDI | Nghi Son Economic Zone and Industrial Park Management Board Add:Truc Lam ward, Nghi Son town, Thanh Hoa province Tel: 02373617237 Fax: 02373617239 |
109 | Project on building material macadamia areas and hi-tech processing and preservation plant | To build material macadamia areas applying science and high technology in tree planting and nurturing, harvesting, processing, product output, etc. | To be located in Nam Po, Dien Bien and Tuan Giao districts and Dien Bien Phu city, Dien Bien province | 30,000 ha/ 120,000 tons of nuts/year | 260 | 100% FDI or joint venture | Dien Bien province’s Department of Planning and Investment Add: No. 900, Vo Nguyen Giap street, Dien Bien Phu city Tel: 02153838688 |
110 | Building 3 hi-tech centers in forestry, timber and non-timber forest product processing | To improve productivity, quality and added value from planted forests; to develop stable material areas to serve processing and meet the demand of domestic and export markets | Phu Tho, Nghe An and Binh Duong provinces | To apply scientific and technological advances in production, from the stage of production of saplings, forest planting and nurturing to product processing, and adopt policies on association between forest planters and processing enterprises based on forest product value chain. | 200 | Joint venture or 100% FDI | Vietnam Administration of Forestry, Ministry of Agriculture and Rural Development Add: No. 2, Ngoc Ha, Ba Dinh, Hanoi Tel: 02438438792 Fax: 02438438792 |
111 | Project on production of hi-tech agricultural products in the Hi-Tech Agricultural Park in Hau Giang province | To apply high technologies to produce high-value agricultural products. To form a hi-tech agricultural production sub-area for local key products to improve production efficiency and income of farmers, serve as a model for expanding hi-tech agricultural production areas in Hau Giang province and other regional localities | Long My district, Hau Giang province | Central areas: 415 ha | 144 | Joint venture or 100% FDI | Hau Giang province’s Department of Planning and Investment Add: No.7, Xo Viet Nghe Tinh, ward 5, Vi Thanh, Hau Giang province |
112 | Project on building a seafood processing plant | To build a seafood processing plant to increase value of the aquaculture sector | Kim Sơn Industrial Park, Ninh Binh province | Area: 2-3 ha; capacity: 5,000 tons/year | 100 | 100% FDI or joint venture | Ninh Binh province’s Department of Planning and Investment of Add: No. 8, Le Hong Phong, Van Giang ward, Ninh Binh city Tel: 02293873381 |
113 | Project on building hi-quality industrial wood processing plants | To produce MDF boards and floorboards from planted forest timber in the province | Industrial parks in Quang Binh province | Project scale: 10ha; capacity: 150,000- 180,000 m3/year | 100 | 100% FDI or joint venture | Quang Binh Economic Zone Management Board Add: No. 117, Ly Thuong Kiet, Dong Hoi city, Quang Binh province Tel: 02323828513 Fax: 02323828516 |
114 | Project on Moc Chau hi-tech agricultural zone | To build a satellite area and study and produce high-quality agricultural products such as vegetables, flowers, fruits, animal husbandry, and processing of agricultural products | Moc Chau district, Son La province | 200 ha | 100 | 100% FDI or joint venture | Son La province’s Department of Planning and Investment Add: Floor 6, the 9-story Building - Provincial Administration Center, residential quarter 7, To Hieu ward, Son La city, Son La province Tel: 02123859938 Fax: 02123852032 Email: [email protected] |
115 | Building vegetable and fruit processing plants combined with development of vegetable and fruit material areas | To form centralized safe vegetable and fruit material areas combined with processing | All 12 administrative units in Son La province | Proposed by investors | 100 | 100% FDI or joint venture | Son La province’s Department of Planning and Investment Add: Floor 6, 9-story building, Provincial Administration Center, residential quarter 7, To Hieu ward, Son La city, Son La province Tel: 02123859938 Fax: 02123852032 Email: [email protected] |
116 | Hi-tech agricultural park project | To accelerate agricultural restructuring | Chu Se, Chu Prong, Mang Yang, and Chu Pah districts, Gia Lai province | 500-1,000 ha | 97.5 | Bidding for investor selection | Gia Lai province’s Department of Planning and Investment Add: No. 2 Hoang Hoa Tham, Pleiku city, Gia Lai province Tel: 02693824 414 |
117 | Tan Phu Agro-Industrial Park | To invest in building a complete modern agro-industrial park, from the stage of production to processing and distribution of vegetables, tubers and fruits meeting international standards. | Phu Hoi commune, Lien Nghia township, Duc Trong district | 205.1 ha | 500 | Joint venture or 100% FDI | Lam Dong province’s Investment, Trade and Tourism Promotion Center: Nos. 02 - 04 Tran Quoc Toan street, ward 3, Da Lat city, Lam Dong province Tel: 02633832 964 Fax: 02633811 656 |
118 | Project on centralized cattle slaughtering facilities | To supply fresh food, meeting food safety and hygiene standards for people in the province | All 12 administrative units of Son La province | Proposed by investors | 96 | 100% FDI or joint venture | Son La province’s Department of Planning and Investment Add: Floor 6, 9-story building, Provincial Administration Center, residential quarter 7, To Hieu ward, Son La city, Son La province Tel: 02123859938 Fax: 02123852032 Email: [email protected] |
119 | Project on raising and processing aquatic products for export | To raise aquatic animals and process and preserve aquatic products | Nga Bay town and Chau Thanh district, Hau Giang province | 1,500 ha | 71 | Joint venture or 100% FDI | Hau Giang province’s Department of Planning and Investment Add: No. 7, Xo Viet Nghe Tinh, ward 5, Vi Thanh city, Hau Giang province Tel: 02933870214 Fax: 02933878871 |
120 | Development of smart agricultural value chains adaptable to climate change in Tay Ninh province | To build the fruit and vegetable value chain with upgraded infrastructure and services, adapting to climate change and applying eco-friendly high technologies so as to achieve high production and business efficiency, increase market linkage, improve vegetable and fruit production and trading practices to ensure quality and food safety | To implement 2 components in Tay Ninh province | Component 1: To build infrastructure facilities for smart agricultural value chains adaptable to climate change. Component 2: To provide technical assistance and project management to improve production capacity and apply high technologies to agricultural product value chain; to provide technical assistance for agricultural extension, origin tracking, and management of supply and information chain | 60 | Joint venture or 100% FDI | Tay Ninh province’s Department of Planning and Investment Add: No. C300, the August Revolution street, Ward 2, Tay Ninh city, Tay Ninh province Tel: 02763827 638 |
121 | Clean agriculture and hi-tech agriculture projects | To develop livestock husbandry and crop cultivation to control diseases and epidemics and ensure food safety and hygiene for livestock products | Hung Yen province | 200 ha | 54 | 100% FDI or joint venture | People’s Committee of Hung Yen province Add: No. 10, Chua Chuong street, Hien Nam ward, Hung Yen city Tel: 02213863 823 |
122 | Wood processing plant | To produce products from industrial wood, meeting domestic demands and export | Cho Moi district, Bac Kan province | Plant with a capacity of 100,000m3/year | 50 | 100% FDI | Bac Kan province’s Department of Planning and Investment Add: No. 9, Truong Chinh road, Bac Kan city, Bac Kan province Tel: 0912149180/ 02093870136; Fax: 02093871287 |
123 | Ba Ria-Vung Tau fisheries center | To form a synchronous fisheries infrastructure system, combined with supporting industries and logistics services, improving the efficiency of aquaculture production, processing and consumption | Ba Ria-Vung Tau | | 50 | Joint venture or 100% FDI | Directorate of Fisheries, Ministry of Agriculture and Rural Development Add: No. 10 Nguyen Cong Hoan, Ngoc Khanh, Ba Dinh, Hanoi |
124 | Project on building clam processing plants with a capacity of 70,000 tons/year | To develop agricultural sector | Thai Thuy and Tien Hai districts, Thai Binh province | 70.000 tons/year | 50 | 100% FDI or joint venture | Thai Binh province’s Department of Planning and Investment Add: No. 233, Hai Ba Trung, De Tham ward, Thai Binh city |
125 | Investment project on processing surimi-based products | To invest in plant on processing surimi imitation products, surimi sticks | Nghi Son town, Thanh Hoa province | 3,000- 5,000 tons products/year | 10-50 | Joint venture | Thanh Hoa province’s Department of Agriculture and Rural Development Add: No. 49 Le Loi avenue, Tan Son ward, Thanh Hoa city Tel: 02373850281 |
126 | Project on conservation and development of Tan Cuong specialty tea area combined with eco-tourism | - To raise income for tea growers; to apply high technologies and techniques in tea production and processing. - To contribute to enhancing brand value; to protect ecological environment. - To organize eco-tourism in Tan Cuong specialty tea area. | Tan Cuong specialty tea area, Thai Nguyen | 2,000 ha, industrial scale | 40 | Joint venture or 100% FDI | Department of International Cooperation, Ministry of Agriculture and Rural Development Add: No. 2 Ngoc Ha, Ba Dinh, Hanoi Tel: 02437347081 People’s Committee of Thai Nguyen city Add: 10 Nguyen Du, Thai Nguyen city, Thai Nguyen province Tel: 02803858962 Fax: 2803854998 |
127 | Project on joint production and consumption of high-quality vegetables, tubers and fruits | To develop commodity vegetable, tuber and fruit production areas of Nam Dinh province | Y Yen, Vu Ban, Nam Truc, Giao Thuy, Hai Hau, etc., districts, Nam Dinh province | 1,000-2,000 ha | 30-40 | 100% FDI or joint venture | Nam Dinh province’s Department of Agriculture and Rural Development Add: No. 07, Tran Nhat Duat, Nam Dinh province |
128 | Agricultural product processing plant (coffee, rubber, pepper, avocado, cacao, etc.) | To turn out a large quantity of goods of high productivity, good quality, and reasonable costs, meeting strict requirements of domestic and international markets. - To increase the value of coffee, rubber, pepper, avocado, cacao, etc. | Hoa Phu Industrial Park, Buon Me Thuot city, Dak Lak province | Area: 10 ha (2 ha/plant) 50,000 tons of products/year/plant | 35 | Joint venture or 100% FDI | Dak Lak Province Industrial Park Management Board Add: 07 Truong Chinh, Buon Ma Thuot city, Dak Lak province Tel: 02623841777 |
129 | Hi-tech agricultural production project | To carry out hi-tech agricultural production in Sa Pa town | Taa Giang Phinh commune – Sa Pa town | 450 ha | 35 | 100 % FDI or joint venture | Lao Cai province’s Department of Agriculture and Rural Development Add: Block 8, Nam Cuong ward, Lao Cai city |
130 | Meat processing plants combined with livestock production based on the value chain | To raise the value of the livestock production sector, to develop sustainable livestock, ensure food safety | Industrial parks and economic zones of Ha Tinh province | 300,000 tons/year | 30 | 100 % FDI or joint venture | Ha Tinh Province Economic Zone Management Board Add: Ky Loi commune, Ky Anh town, Ha Tinh province |
131 | Project on building a plant processing seafood for export | To invest in a plant processing seafood for export to make the fullest use of the local fresh aquatic resources | Industrial parks in Quang Binh province | Project scale 3-5 ha; processing capacity 5,000 tons/year | 30 | 100 % FDI or joint venture | Quang Binh Economic Zone Authority Add: No. 117, Ly Thuong Kiet, Dong Hoi city, Quang Binh province Tel: 02323828513 Fax: 02323828516 |
132 | Hi-tech agricultural area project | To take advantage of Van Ban, a lowland district which has a large land area with clear grounds available for handover to investors; favorable climatic, land and pedologic conditions for implementation of hi-tech agricultural projects | Khanh Yen Thuong and Khanh Yen Ha communes, Van Ban district, Lao Cai province | 200 - 300 ha | 26 | 100% FDI or joint venture | People’s Committee of Van Ban district, Lao Cai province Add: Khanh Yen township, Van Ban district, Lao Cai province |
133 | Investment project on hi-tech agriculture | To invest in building an argricultural product processing and preservation plant to meet demand for domestic consumption and export | Loc Thuy commune, Phu Loc district, Thua Thien Hue province | To apply high techniques in planting food crops, fruit trees , etc., meeting food safety and hygiene standards | 26 | Joint venture | Management Board of Thua Thien Hue Economic and Industrial Zones; Investment Promotion and Enterprise Support Center, Department of Planning and Investment of Thua Thien Hue province |
134 | Canned food processing plant project | To carry out post-harvest production and processing of agricultural products for domestic consumption and export. To effectively exploit available abundant raw materials, contributing to creating stable inputs for local agricultural products | Binh Minh Industrial Park, Binh Minh district, Vinh Long province | 15 ha | 24 | 100 % FDI or joint venture | Vinh Long Industrial Zones Authority. Add: No. 85, Trung Nu Vuong street, Ward 1, Vinh Long city, Vinh Long province Tel: 02703820972 Email: [email protected] |
135 | Project on building infrastructure facilities of the transshipment area for imported and exported agricultural products at Tra Linh border gate | To build infrastructure facilities for investment and construction of the projects of an area for processing and packaging agricultural, forestry and aquatic products for export; commercial, tourist service area; warehouses, storing yards, etc. | Tra Linh border gate, Trung Khanh district, Cao Bang province | 80 ha | 22 | 100% FDI; PPP | People’s Committee of Cao Bang province Add: No. 011 - Hoang Dinh Giong road, Cao Bang city, Cao Bang province |
136 | Fruit and vegetable processing plant | To process vegetables, tubers and fruits to supply to the market, contributing to the consumption of agricultural products for local people | Cao Lanh and Thap Muoi districts, Dong Thap province | Proposed by investors | 22 | Joint venture or 100% FDI | Dong Thap province’s Department of Planning and Investment Add: No. 11, Vo Truong Toan street, Ward 1, Cao Lanh city, Dong Thap province Tel: 027733877747 |
137 | Project on fish production and processing for export at Thac Ba lake | To produce and process fish for export | Yen Binh district, Yen Bai province | Farming area and processing factory | 22 | 100% FDI | Yen Bai province’s Department of Planning and Investment Add: No. 1183, Yen Ninh street, Dong Tam ward, Yen Bai city, Yen Bai province Tel: 02163853052 |
138 | Hi-tech agricultural project | To formulate a centralized hi-tech agricultural project. To cooperate in training and transfer of hi-tech agriculture | Cao Bang city, Cao Bang province | 30 ha | 21 | 100% FDI | People’s Committee of Cao Bang province Add: No. 011 - Hoang Dinh Giong street, Cao Bang city, Cao Bang province |
139 | Project on building a plant on processing and preservation of products from fruit trees | To build physical foundations, apply deep processing technologies and advanced preservation technologies for a number of local fruit products so as to improve the value and competitiveness of fruit products and serve domestic market and export | All 10 administrative units in Dien Bien province | Processing capacity: 10,000-20,000 tons of fruit/year | 20 | 100% FDI or joint-venture | Dien Bien province’s Department of Planning and Investment Add: No. 900, Vo Nguyen Giap street, Dien Bien Phu city Tel: 02153838688 |
140 | High-grade timber processing plant | To build a high-grade timber processing plant meeting export standards in order to promote the advantages of high-quality planted forest timber from a large-area material area, contributing to the expansion of the FSC-FM certified forest material area. | Tan Bac industrial cluster, Tan Bac commune, Quang Binh district, Ha Giang province | Capacity: 100,000 m3/year of high-grade wood products, artificial boards meeting export standards | 20 | 100% FDI or joint venture | Ha Giang province’s Department of Planning and Investment Add: No. 188, Tran Hung Dao street, Nguyen Trai ward, Ha Giang city Tel: 02193866256 Fax: 02193867623 Email: [email protected] |
141 | Hi-tech agricultural production project | To study, apply, test and perform hi-tech agricultural production models; to train hi-tech human resources in the agriculture sector | Tan Duc, Uc Ky, and Xuan Phuong communes, Phu Binh district, Thai Nguyen province | 220 ha | 20 | Joint venture or 100% FDI | People’s Committee of Phu Binh district, Thai Nguyen province. Add: Group 2, Huong Son town, Phu Binh district, Thai Nguyen province Tel: 02083.867.205 Email: [email protected]. vn |
142 | Project on a plant processing shrimp products for export for the period of 2020-2025 | To develop value chains of agricultural products; to enhance export value | Industrial zones and clusters in Ben Tre province | Capacity: about 6,500 tons of finished products/year | Depending on investors’ funding capacity | Any form | Ben Tre province’s Startup and Investment Promotion Center Add: 28, Le Dai Hanh, An Hoi street, Ben Tre city, Ben Tre province Tel: 02753 575690 Fax: 02753 825340 Email: [email protected] |
143 | Ben Tre Hi-Tech Agriculture Park | To invest in building modernity-oriented technical and physical facilities at the Hi-Tech Agriculture Center to serve hi-tech application in agricultural production in the province and develop agricultural varieties for the whole province. | Chau Thanh district, Ben Tre province | The total natural area is 38.14 ha, including 2 separate zones: + The 1st zone is at the Hi-Tech Agriculture Center - Phuoc Thanh hamlet, Tam Phuoc commune, Chau Thanh district - 6.14 ha; + The 2nd zone is 600m southwest away from the Hi-Tech Agriculture Center, at Phuoc Hau hamlet, Tam Phuoc commune, Chau Thanh district - 32 ha (with ground already cleared and build the seed testing area of 1.4 ha) | Depending on investors’ capacity | 100% FDI; PPP | Ben Tre province’s Startup and Investment Promotion Center Add: 28, Le Dai Hanh, An Hoi ward, Ben Tre city, Ben Tre province Tel: 02753575690 Fax: 0275)3825340 Email: [email protected] |
144 | Fruit processing plant | To process fruit products into refined products to serve consumption demands and improve the value of typical agricultural products of the locality (orange, grape fruit, longan, etc.) | Kim Boi commune, Hoa Binh province | Processing capacity: 25,000-50,000 tons/year | Selected by investors | 100% FDI or joint venture | People’s Committee of Kim Boi district Add: Bo township, Kim Boi district, Hoa Binh province Tel: 02183870423 |
IX | PRODUCTION AND SERVICE |
145 | Finance center project | To build a finance, banking, trade and multi-purposed service center | Thu Thiem New Urban Area, District 2, Ho Chi Minh City | - Project scale: 14,461 m2 - Construction floor area: about 220,000 m2 - Floor area ratio (FAR): 13.97-16.03 (depending on each land lot) - Number of stories: 20-50 (depending on each land lot). | | Auction of land use rights | Thu Thiem New Urban Area Construction Investment Management Board Add: No. 255 Tran Hung Dao, Co Giang ward, district 1, Ho Chi Minh City ĐT: 0835261271 - 0835261299 Fax: 0835261272 | |
146 | Robot design and manufacturing project | To design and manufacture robots | Hi-tech park, Da Nang city | Investment ratio: USD 8-15 million /ha | Depending on investors’ funding capacity | 100% FDI | Da Nang Hi-Tech Park and Industrial Zones Authority Add: Lot A17, Heart road, Hi-tech park, Hoa Lien commune, Hoa Vang district, Da Nang Tel: 02363666117 Email: [email protected] | |
147 | Project on manufacturing chips, biosensors | To manufacture chips, biosensors | Hi-tech park, Da Nang city | Investment ratio: USD 10-15 million /ha | Depending on investors’ funding capacity | 100% FDI | Da Nang Hi-Tech Park and Industrial Zones Authority Add: Lot A17, Heart road, Hi-tech park, Hoa Lien commune, Hoa Vang district, Da Nang Tel: 02363666117 Email: [email protected] | |
148 | High-quality stainless steel mill | To manufacture high-quality steel products | Vung Ang Economic Zone, Ha Tinh Province | 100 ha | 1,500 | 100% FDI | Management Board of Ha Tinh Economic Zones Add: Ky Loi commune, Ky Anh township, Ha Tinh province | |
149 | Electronic component manufacture and assembly plant (phones, television sets, computers, cars, etc.) | To build an electronic component manufacture and assembly plant (phones, televisions, computers, cars, etc.) | Industrial zones in Lao Cai province | 50-100 ha | 500 | 100 % FDI or joint venture | Management Unit of Lao Cai Economic Zones Add: No. 001, Nguyen Hue street, Lao Cai ward, Lao Cai city | |
150 | Gas production plant | To supply liquefied petroleum gas products in service of the demand for civil and industrial use | Thai Binh economic zone, Tien Hai district, Thai Binh province | According to specific project of investor | 300 | 100% FDI or joint venture | Management Unit of Thai Binh Economic Zones and Industrial Parks Add: Ngo Gia Kham road, Phuc Khanh industrial park, Phu Khanh ward, Thai Binh city | |
151 | Chu Lai airport aviation industry center | To build an aviation industry center | Chu Lai Open Economic Zone | 100 ha according to the general master plan in the Chu Lai Open Economic Zone approved by the Prime Minister in Decision No. 1737/QD-TTg of December 13, 2018 | 217.4 | 100% FDI or joint venture | Management Unit of Chu Lai Open Economic Zone Add: Le Thanh Tong street, An Phu ward, Tam Ky city Tel: 02353812849 | |
152 | Plant producing refined products from rubber latex (tires, wheels, etc. ). | To effectively exploit the potential and strengths of the province; to realize the linkage among production-processing-consumption; to apply scientific outcomes in processing and creating products with added value and competitiveness, meeting the demand for domestic market and export. | Kon Tum city, Kon Tum province | Area: 10 ha, 25.000 - 30.000 tons/year | 200 | Joint venture or 100% FDI | Kon Tum province’s Department of Agriculture and Rural Development Add: No. 508 Duy Tan, Duy Tan ward, Kon Tum city, Kon Tum province Tel: 02603862 516 | |
153 | Mineral, metallurgical and chemical processing project in Tang Loong industrial park | To build a plant manufacturing components from copper, steel and graphite products in Tang Loong industrial park, Lao Cai province | Tang Loong industrial park, Lao Cai province | 140 ha | 120 | 100 % FDI or joint venture | Management Board of Lao Cai Economic Zones Add: No. 001, Nguyen Hue street, Lao Cai ward, Lao Cai city | |
154 | Project on building a plant on production of energy-efficient lighting equipment | To produce energy-efficient lighting equipment for domestic demand and export | Industrial zones in Quang Binh province | Project scale: 50ha; capacity proposed by investors | 50-100 | 100% FDI or joint venture | Management Board of Quang Binh Economic Zone Add: No. 117, Ly Thuong Kiet, Dong Hoi city, Quang Binh province Tel: 02323828 513 Fax: 02323828 516 | |
155 | Engine and farming machine plant | To invest in building an engine and farming machine plant for supply to the domestic market and for export | Southeast Economic Zone (VSIP Industrial Park, Tho Loc), Nghe An province | 20,000 pieces/year | 52 | 100 % FDI | Nghe An Investment, Trade and Tourism Promotion Center Add: No. 16, Truong Thi street, Vinh city, Nghe An province Tel: 02388722788 | |
156 | Mechanical engineering plant serving agricultural production | To manufacture all kinds of agricultural tractors, harvesters and equipment for the agriculture sector | Hoa Phu Industrial Park, Buon Ma Thuot city, Dak Lak province | Area: 5 ha Scale: 50,000 products/year | 22 | Joint venture or 100% FDI | Management Board of Dak Lak Industrial Parks Add: 07 Truong Chinh, Buon Ma Thuot city, Dak Lak province Tel: 02623841777 | |
157 | Electric cables and renewable energy-operated electrical equipment manufacturing plant | To serve renewable energy power projects | Nhan Co Industrial Park, Nhan Co 2 Industrial Park, Nhan Co commune, Dak R’lap district, Dak Nong province | 50.000 tons product/year; 3-5ha | 20 | 100% FDI | People’s Committee of Dak Nong province Add: March 23 street, Gia Nghia city, Dak Nong province Tel: 02613701166 | |
| | | | | | | | | | |