Decision 1313/QD-BCT 2025 approval of the electricity generation price bracket for combined cycle gas turbine power plants using liquefied natural gas
ATTRIBUTE
Issuing body: | Ministry of Industry and Trade | Effective date: | Known Please log in to a subscriber account to use this function. Don’t have an account? Register here |
Official number: | 1313/QD-BCT | Signer: | Nguyen Hoang Long |
Type: | Decision | Expiry date: | Updating |
Issuing date: | 13/05/2025 | Effect status: | Known Please log in to a subscriber account to use this function. Don’t have an account? Register here |
Fields: | Electricity , Industry |
THE MINISTRY OF INDUSTRY AND TRADE No. 1313/QD-BCT | THE SOCIALIST REPUBLIC OF VIETNAM Hanoi, May 13, 2025 |
DECISION
On approval of the electricity generation price bracket for combined cycle gas turbine power plants using liquefied natural gas in 2025
__________
THE MINISTER OF INDUSTRY AND TRADE
Pursuant to the Law on Electricity dated November 30, 2024;
Pursuant to Decree No. 40/2025/ND-CP dated February 26, 2025, of the Government, prescribing the functions, tasks, powers and organizational structure of the Ministry of Industry and Trade;
Pursuant to Circular No. 09/2025/TT-BCT dated February 1, 2025, of the Minister of Industry and Trade, on the dossier, order, procedures, and methods for determining and approving the electricity generation price bracket; dossier, order, procedures for developing and approving the electricity import price bracket;
Considering the proposals of Vietnam Electricity (Document No. 1771/EVN-TTD dated March 20, 2025, Document No. 2516/EVN-TTD dated April 18, 2025, and Document No. 3510/EPTC-KDMD dated May 5, 2025);
At the proposal of the Director of the Electricity Regulatory Authority.
DECIDES:
Article 1. Approval of the electricity generation price bracket for combined cycle gas turbine power plants using liquefied natural gas (LNG) in 2025
1. The maximum price (exclusive of value-added tax) of the electricity generation price bracket in 2025 applicable to combined cycle gas turbine power plants using LNG as prescribed at Point a, Clause 2, Article 1 of Circular No. 09/2025/TT-BCT is 3,327.42 VND/kWh.
2. The parameters used to calculate the maximum price of the electricity generation price bracket applicable to combined cycle gas turbine power plants using LNG in 2025 are provided in the attached Appendix.
Article 2. Organization of implementation
Based on the electricity generation price bracket prescribed in Article 1 of this Decision, Vietnam Electricity and power generation units shall enter into power purchase agreements in compliance with regulations on the method for determining electricity generation service prices issued by the Minister of Industry and Trade.
Article 3. Implementation provisions
1. This Decision takes effect on the date of its signing.
2. The Chief of the Ministry Office, Director of the Electricity Regulatory Authority, Director General of the Department of Legal Affairs, Heads of affiliated units of the Ministry, General Director of Vietnam Electricity, and Heads of relevant power generation units shall implement this Decision./.
| FOR THE MINISTER THE DEPUTY MINISTER
Nguyen Thanh Long |
APPENDIX
Parameters used to calculate the maximum price of the electricity generation price bracket applicable to combined cycle gas turbine power plants using LNG in 2025
(Attached to Decision No. 1313/QD-BCT dated May 13, 2025, of the Minister of Industry and Trade)
Calculation parameters for electricity generation price bracket for gas turbine power plants using LNG
No. | Parameter used | Value |
1 | Calculated capacity | 1,551,490 kW |
2 | Net heat loss rate at 85% load | 6,330.17 BTU/kWh |
3 | LNG import price | 14.05 USD/million BTU |
4 | Estimated transportation cost (covering LNG transportation to the regasification terminal, storage, regasification, and post-regasification distribution) * | 2.589272 USD/million BTU |
5 | Exchange rate | 25,670 VND/USD |
(*): The transportation cost will be updated upon approval by the Ministry of Industry and Trade of the service prices for LNG storage, regasification, transportation, and distribution.
VIETNAMESE DOCUMENTS
This utility is available to subscribers only. Please log in to a subscriber account to download. Don’t have an account? Register here
This utility is available to subscribers only. Please log in to a subscriber account to download. Don’t have an account? Register here
ENGLISH DOCUMENTS
This utility is available to subscribers only. Please log in to a subscriber account to download. Don’t have an account? Register here
This utility is available to subscribers only. Please log in to a subscriber account to download. Don’t have an account? Register here