Circular 70/2025/TT-BTC charges for appraisal and approval of fire prevention and firefighting designs

  • Summary
  • Content
  • Status
  • Vietnamese
  • Download
Save

Please log in to use this function

Send link to email

Please log in to use this function

Error message
Font size:

ATTRIBUTE

Circular No. 70/2025/TT-BTC dated July 01, 2025 of the Ministry of Finance prescribing the rate, regime of collection, remittance, management and use of the charges for appraisal and approval of fire prevention and firefighting designs
Issuing body: Ministry of FinanceEffective date:
Known

Please log in to a subscriber account to use this function.

Don’t have an account? Register here

Official number:70/2025/TT-BTCSigner:Cao Anh Tuan
Type:CircularExpiry date:Updating
Issuing date:01/07/2025Effect status:
Known

Please log in to a subscriber account to use this function.

Don’t have an account? Register here

Fields:Construction , Tax - Fee - Charge , Transport

SUMMARY

Fee Rates for Appraisal and Approval of Fire Prevention and Fighting Design from July 01, 2025

On July 1, 2025, the Ministry of Finance issued Circular No. 70/2025/TT-BTC, stipulating the rates, collection, payment, management, and use of fees for the appraisal and approval of fire prevention and fighting designs. This Circular takes effect on July 1, 2025.

This Circular applies to investment projects for construction works, structures, and transportation means related to fire prevention, fighting, and rescue. The subjects of application include fee payers, organizations collecting fees for the appraisal and approval of fire prevention and fighting designs, and other related organizations and individuals.

Accordingly, the fee rates for the appraisal and approval of fire prevention and fighting designs for projects are based on the total investment of the project and the fee calculation rate specified in the Schedule of Fee Calculation Rates for Appraisal and Approval of Fire Prevention and Fighting Design issued with this Circular.

The appraisal fee rates for the appraisal of fire prevention and fighting designs of works that undergo renovation, change of function during use; modification of transportation means; new construction of project items are determined based on the total investment value of the works that undergo renovation, change of function during use; modification of transportation means; new construction of project items.

The minimum appraisal fee to be paid as per the above regulations is 500,000 VND/project and the maximum is 150,000,000 VND/project.

For more details, click here.
Download files here.
LuatVietnam.vn is the SOLE distributor of English translations of Official Gazette published by the Vietnam News Agency
Effect status: Known

THE MINISTRY OF FINANCE
__________

No. 70/2025/TT-BTC

THE SOCIALIST REPUBLIC OF VIETNAM

Independence - Freedom - Happiness
______________________

Hanoi, July 01, 2025

 CIRCULAR

Prescribing the rate, regime of collection, remittance,
management and use of the charges for appraisal and approval of fire prevention and firefighting designs

_____________________

 

Pursuant to the November 25, 2015 Law on Charges and Fees;

Pursuant to the June 25, 2015 Law on State budget;

Pursuant to the June 13, 2019 Law on Tax administration;

Pursuant to the November 29, 2024 Law on Fire Prevention, Firefighting, Rescue and Relief;

Pursuant to the Government’s Decree No. 120/2016/ND-CP of August 23, 2016 detailing and guiding the implementation of a number of articles of the Law on Charges and Fees; the Government’s Decree No. 82/2023/ND-CP of November 28, 2023 amending and supplementing a number of Articles of the Government’s Decree No. 120/2016/ND-CP of August 23, 2016 detailing and guiding the implementation of a number of articles of the Law on Charges and Fees;

Pursuant to the Government’s Decree No. 105/2025/ND-CP of May 15, 2025 detailing a number of articles and measures for the implementation of the Law on Fire prevention, firefighting, rescue and relief;

Pursuant to the Government’s Decree No. 126/2020/ND-CP of October 19, 2020 detailing a number of articles of the Law on Tax administration; the Government’s Decree No. 91/2022/ND-CP of October 30, 2022 amending and supplementing a number of Articles of the Government’s Decree No. 126/2020/ND-CP of October 19, 2020 detailing a number of articles of the Law on Tax administration;

Pursuant to the Government’s Decree No. 11/2020/ND-CP of January 20, 2020 prescribing administrative procedures in the field of State Treasury;

Pursuant to the Government’s Decree No. 123/2020/ND-CP of October 19, 2020 prescribing invoices and vouchers; the Government’s Decree No. 70/2025/ND-CP of March 20, 2025 amending and supplementing a number of articles of the Government’s Decree No. 123/2020/ND-CP of October 19, 2020 prescribing invoices and vouchers;

Pursuant to the Government’s Decree No. 29/2025/ND-CP of February 24, 2025, defining the functions, tasks, powers and organizational structure of the Ministry of Finance; the Government’s Decree No. 166/2025/ND-CP of June 30, 2025 amending and supplementing a number of Articles of the Government’s Decree No. 29/2025/ND-CP of February 24, 2025, defining the functions, tasks, powers and organizational structure of the Ministry of Finance;

At the proposal of Director of the Tax Policies, Fees and Charges Supervisory Authority;

The Minister of Finance promulgates the Circular prescribing the rate, regime of collection, remittance, management and use of the charges for appraisal and approval of fire prevention and firefighting designs.

 

Article 1. Scope of regulation and subjects of application

1. This Circular prescribes the rate, regime of collection, remittance, management, and use of the charges for appraisal and approval of fire prevention and firefighting designs applicable to investment projects for construction works, facilities, and means of transportation (below collectively referred to as “projects”) in accordance with the law on fire prevention, firefighting, rescue and relief.

For projects appraised by specialized construction authorities regarding the contents prescribed by the law on fire prevention, firefighting, rescue and relief, the collection shall include the appraisal charge for the appraisal of construction investment feasibility study reports and the appraisal charge for construction designs to be implemented after the basic design, in accordance with the law on charges and fees.

For means of transportation appraised by registration authorities regarding the contents prescribed by the law on fire prevention, firefighting, rescue and relief, the collection shall be service charges for inspection in accordance with the law on pricing.

2. This Circular applies to charge payers, charge-collecting organizations for charges for appraisal and approval of fire prevention and fighting designs, and other organizations and individuals related to the collection, remittance, management, and use of the charges for appraisal and approval of fire prevention and firefighting designs.

Article 2. Charge payers

Organizations and individuals, when granted by a competent state authority a document approving the fire prevention and firefighting design appraisal, shall pay the charges in accordance with the provisions of this Circular.

Article 3. Charge-collecting organizations

State agencies vested with authority to provide appraisal services for fire prevention and firefighting designs under the provisions of the law on fire prevention, firefighting, rescue and relief shall act as charge-collecting organizations as prescribed by this Circular.

Article 4. Method of calculating charge rates

1. The charges for appraisal and approval of fire prevention and firefighting designs (below referred to as the “appraisal charge rate”) applicable to projects shall be determined according to the following formula:

 

Appraisal Charge Rate

=

Total Project Investment

x

Charge Rate Percentage

Where:

- The total project investment shall be determined in accordance with the provisions of the law on management of construction investment costs, excluding compensation and site clearance costs, support and resettlement costs, and land use costs (calculated before tax).

- The charge rate percentage shall be prescribed in the Schedule of charge rate percentages for appraisal of fire prevention and firefighting design approval promulgated together with this Circular.

- In case the total project investment falls between the investment value ranges specified in the Schedule of charge rate percentages for appraisal of fire prevention and firefighting design approval promulgated together with this Circular, the charge rate percentage shall be determined according to the following formula:

Where:

- Nit is the charge rate percentage of project i according to the investment value scale to be calculated (Unit: %).

- Git is the total project investment value of project i subject to appraisal charge calculation (Unit: VND billion).

- Gia is the upper-limit total project investment value corresponding to the project subject to appraisal charge calculation (Unit: VND billion).

- Gib is the lower-limit total project investment value corresponding to the project subject to appraisal charge calculation (Unit: VND billion).

- Nia is the charge rate percentage of project i corresponding to Gia (Unit: %).

- Nib is the charge rate percentage of project i corresponding to Gib (Unit: %).

2. The appraisal charge rate for appraisal of fire prevention and firefighting designs of constructions undergoing renovation or change of use during operation; conversion of means of transportation; or construction of new project items shall be determined based on the total investment value of the works undergoing renovation or change of use during operation; the converted means of transportation, or the newly constructed project items.

3. The appraisal charge payable as prescribed in Clauses 1 and 2 of this Article shall be not less than VND 500,000/project and not more than VND 150,000,000/project.

Article 5. Declaration and payment of charges

1. Charge payers shall pay charges at the rates prescribed in this Circular to charge-collecting organizations in the form specified in the Minister of Finance’s Circular No. 74/2022/TT-BTC of December 22, 2022 prescribing forms, deadlines for collection, remittance, and declaration of fees and charges under the regulatory authority of the Ministry of Finance.

2. No later than the 5th day of each month, charge-collecting organizations must transfer the charges collected in the preceding month into the charge account pending remittance to the state budget opened at the State Treasury. Charge-collecting organizations shall declare and remit the collected charges in accordance with the provisions of Circular No. 74/2022/TT-BTC.

Article 6. Management and use of charges

1. Charge-collecting organizations may retain 60% of the collected charge amount to cover expenses for service provision and charge collection activities in accordance with Clause 4, Article 1 of the Government’s Decree No. 82/2023/ND-CP of November 28, 2023 amending and supplementing a number of Articles of the Government’s Decree No. 120/2016/ND-CP of August 23, 2016 detailing and guiding the implementation of a number of Articles of the Law on Charges and Fees; remit 40% of the collected charge amount to the state budget under the corresponding chapter and sub-items of the State Budget Index, except as prescribed in Clause 2 of this Article.

2. If the charge-collecting organization is a state agency not subject to the allocation of operating expenses from charge revenues as prescribed in Clause 3, Article 1 of Decree No. 82/2023/ND-CP, the entire amount of collected charges must be remitted to the state budget. Funding for service provision and charge collection activities shall be allocated from the state budget within the approved estimates of the collecting organization, in accordance with the state budget expenditure regime and norms as prescribed by laws.

Article 7. Implementation provisions

1.     This Circular takes effect from July 01, 2025.

2. This Circular repeals:

a) The Minister of Finance’s Circular No. 258/2016/TT-BTC of November 11, 2016 prescribing the rate, regime of collection, remittance, management, and use of the charges for appraisal and approval of fire prevention and firefighting designs.

b) Article 2 of the Minister of Finance’s Circular No. 52/2019/TT-BTC of August 16, 2019 amending and supplementing a number of Articles of the Minister of Finance’s Circular No. 217/2016/TT-BTC of November 10, 2016 prescribing the rate, regime of collection, remittance, management, and use of charges for verification of papers and documents at the request of individuals; the Minister of Finance’s Circular No. 258/2016/TT-BTC of November 11, 2016 prescribing the rate, regime of collection, remittance, management, and use of the charges for appraisal and approval of fire prevention and firefighting designs.

3. For dossiers of application for fire prevention and fighting design approval submitted before the effective date of this Circular but granted approval documents from the effective date of this Circular, charges shall be collected in accordance with the provisions of the Minister of Finance’s Circular No. 258/2016/TT-BTC of November 11, 2016 prescribing the rate, regime of collection, remittance, management, and use of the charges for appraisal and approval of fire prevention and firefighting designs.

4. Other matters relating to the collection, remittance, management, use, collection documents, and disclosure of the charge regime not specified in this Circular shall be implemented in accordance with the provisions of relevant legal documents: the Law on Charges and Fees; the Government’s Decree No. 120/2016/ND-CP of August 23, 2016 detailing and guiding the implementation of a number of Articles of the Law on Charges and Fees; Decree No. 82/2023/ND-CP; the Law on Tax Administration; the Government’s Decree No. 126/2020/ND-CP of October 19, 2020 detailing a number of Articles of the Law on Tax Administration; the Government’s Decree No. 91/2022/ND-CP of October 30, 2022 amending and supplementing a number of Articles of the Government’s Decree No. 126/2020/ND-CP of October 19, 2020 detailing a number of Articles of the Law on Tax Administration; the Government’s Decree No. 11/2020/ND-CP of January 20, 2020 prescribing administrative procedures in the field of State Treasury; the Government’s Decree No. 123/2020/ND-CP of October 19, 2020 prescribing invoices and vouchers; the Government’s Decree No. 70/2025/ND-CP of March 20, 2025 amending and supplementing a number of Articles of the Government’s Decree No. 123/2020/ND-CP of October 19, 2020 prescribing invoices and vouchers and the Minister of Finance’s Circular No. 32/2025/TT-BTC of May 31, 2025 guiding the implementation of a number of Articles of the June 13, 2019 Law on Tax Administration, the Government’s Decree No. 123/2020/ND-CP of October 19, 2020 prescribing invoices and vouchers, and Decree No. 70/2025/ND-CP dated March 20, 2025 amending and supplementing a number of Articles of Decree No. 123/2020/ND-CP.

5. If the legal normative documents referred to in this Circular are amended, supplemented, or replaced, the provisions of the newly amended, supplemented, or replaced documents shall apply.

6. In the course of implementation, should any difficulties or obstacles arise, organizations and individuals are requested to promptly report to the Ministry of Finance for study and additional guidance./.

 

 

FOR THE MINISTER

DEPUTY MINISTER

  

Cao Anh Tuan

 

SCHEDULE OF CHARGE RATE PERCENTAGES FOR APPRAISAL AND APPROVAL OF FIRE PREVENTION AND FIREFIGHTING DESIGNS
(Enclosed with the Minister of Finance’s Circular No. 70/2025/TT-BTC of July 01, 2025)

 

1. For projects and works

Unit: Percentage (%)

No

       Total project investment

                 (Unit: VND billion)

 

 

Projects and works

To 15

100

500

1,000

5,000

From 10,000 and above

1

Projects, technical infrastructure works, transportation works

0.00336

0.00182

0.00101

0.00068

0.00038

0.00025

2

Projects, oil and gas works, energy works, chemical works

0.00664

0.00359

0.00200

0.00133

0.00074

0.00050

3

Civil projects and works, other industrial projects and works

0.00484

0.00262

0.00146

0.00097

0.00054

0.00036

4

Other projects and works

0.00444

0.00240

0.00134

0.00089

0.00050

0.00033

Note:

- The categories of projects and works under Items 1, 2, and 3 of this Schedule of Charge Rate Percentages shall be determined in accordance with Appendix I promulgated together with the Government’s Decree No. 06/2021/ND-CP of January 26, 2021 detailing a number of contents on quality management, construction execution, and maintenance of construction works, and any amending, supplementing, or replacing documents (if any).

- The categories of other projects and works under Item 4 include:

+ Other projects and works specified in Appendix I promulgated together with Decree No. 06/2021/ND-CP.

+ Projects and works not specified in Appendix I promulgated together with Decree No. 06/2021/ND-CP.

 

2. For means of transportation

Unit: Percentage (%)

No

                Total project investment

                                 (Unit: VND billion)

 

Means of transportation

To 05

50

100

500

From 1,000 and above

1

Inland waterway vessels; Vietnamese seagoing ships not engaged in international routes of 500 GT or more

0.01215

0.00640

0.00427

0.00237

0.00158

 

Please log in to a subscriber account to see the full text. Don’t have an account? Register here
Please log in to a subscriber account to see the full text. Don’t have an account? Register here
Processing, please wait...
LuatVietnam.vn is the SOLE distributor of English translations of Official Gazette published by the Vietnam News Agency

VIETNAMESE DOCUMENTS

Circular 70/2025/TT-BTC PDF (Original)

This utility is available to subscribers only. Please log in to a subscriber account to download. Don’t have an account? Register here

Circular 70/2025/TT-BTC DOC (Word)

This utility is available to subscribers only. Please log in to a subscriber account to download. Don’t have an account? Register here

Circular 70/2025/TT-BTC DOC (Word)

This utility is available to subscribers only. Please log in to a subscriber account to download. Don’t have an account? Register here

ENGLISH DOCUMENTS

LuatVietnam's translation
Circular 70/2025/TT-BTC DOC (Word)

This utility is available to subscribers only. Please log in to a subscriber account to download. Don’t have an account? Register here

Circular 70/2025/TT-BTC PDF

This utility is available to subscribers only. Please log in to a subscriber account to download. Don’t have an account? Register here