Please Sign In for your LuatVietnam account and sign up for lookup software
Decision 3598/QD-BCT 2021 approving the Plan on power supply and operation of the national power system in 2021
This is a utility for members to sign up for the software.
Please Sign in your LuatVietnam account and sign up for the lookup software .Issuing bodies: | Ministry of Industry and Trade | Effective date: | |
Official number: | 3598/QD-BCT | Signer: | Dang Hoang An |
Legislation Type: | Decision | Expired date: | Updating |
Issuing date: | 31/12/2020 | Effect: | |
Fields: | Electricity , Industry |
Approving the Plan on power supply and operation of the national power system in 2021
Specifically, total nationwide electricity in 2021 produced by power plants (where the generator poles are located) and imported, including rooftop solar power, is 262.410 billion kWh. The maximum nationwide capacity (Pmax) in 2021 is 41,795 MW. Total installed capacity of new power plants (excluding rooftop solar power panels) expected to be put into operation in 2021 is an estimated 6438 MW.
Accordingly, the Ministry of Industry and Trade assigns 11 agencies and sectors to implement this Decision, including: the Vietnam Electricity; the Vietnam Oil and Gas Group; the Oil, Gas and Coal Department; the Electricity Regulatory Authority; etc.
Additionally, the Departments of Industry and Trade of provinces and centrally run cities shall be responsible for coordinating with the Power Corporations and local power companies to strengthen the dissemination of Directive No. 20/CT-TTg dated May 7, 2020; Advise the provincial-level People's Committees to develop plans and direct the Power Corporations, the power companies of provinces and municipalities to effectively implement the National Demand Regulation Program; etc.
This Decision takes effect on the signing date.
For further details of the Decision 3598/QD-BCT, Click here